Condenser Water System Sample Clauses

Condenser Water System. 1) The condenser water system will consist of a two cell roof- mounted, induced draft crossflow cooling tower; two condenser water pumps. Each cooling tower cell and pump will be sized at approximately 50% of the total load or 360 tons per ceil. 2) The cooling towers and main piping risers will be sized for the total estimated building cooling load of 720 tons. Total tonnage is based on an average of 320 SF per ton for 209,000 SF with 10% added for future capacity. 3) The condenser water system will operate at a 10 degrees F (95 degrees F to 85 degrees F) differential temperature. During the economizer mode, the condenser water system will supply as low as 45 degrees F water to the AHU's. 4) Valved and capped condenser water supply and return taps will be provided at each floor within the AHU room for future use. 5) Valved and capped condenser water supply and return taps will be provided within the retail spaces. The tenants will provide the HVAC system(s) within the retail spaces downstream of these taps.
Condenser Water System. Section 45.1. Tenant shall design, permit, procure, install and commission, at Tenant’s cost and expense (subject to Section 6.8 hereof), Tenant’s AC System (as hereinafter defined), which shall provide cooling to the 10th – 12th floors of the Premises. Tenant shall also install, at Tenant’s cost and expense (subject to Section 6.8 hereof), the risers to bring the condenser water from the cooling tower open loop system to the 10th – 12th floors of the Premises for use in the operation of the AC Units on such floors. Tenant shall also install a standalone BACnet Protocol based BMS front-end computer to be operated by Tenant’s staff. For the purposes of this Article 45, the term “Tenant’s AC System” shall mean (i) the cooling tower to be installed on the Terrace of the Building in a location approved by Landlord, the air handlers and the water cooled condensers, the specifications for all of the foregoing to be approved by Landlord in accordance with Article 6, (ii) the cooling tower risers, (iii) a filtration system, (iv) a chemical water treatment system, (v) associated dunnage, (vi) any structural improvements or reinforcements that may be required for the safe and proper installation of any such equipment, and (vii) any associated improvements or equipment that may be necessary for the proper installation and operation of any such equipment. For the avoidance of doubt, the capacity of Tenant’s AC System shall be at least 230 tons.
Condenser Water System a. See Section 1.3 (B) for tenant connection requirements.
Condenser Water System