Compensable Clause Samples
Compensable. In addition to receiving the Basic Lump Sum Fee described in Article 4 and Reimbursable Expenses permitted by Article 5, the Design Professional will be paid for those Extra Services described in the Schedule of Project Details, but only when authorized by the Owner in writing prior to the work necessitated by the following:
6.1.1 General revisions in design, layout, and program requested by the Owner after written acceptance of the previous phase of professional services, provided the Design Professional makes a claim for extra compensation within thirty (30) days after receiving Owner’s instructions regarding such revisions.
6.1.2 Unforeseen circumstances and hidden conditions (neither of which would have been discoverable with the exercise of the standard of care described in §9.3) requiring revisions in the Construction Documents.
6.1.3 Insolvency of the Contractor, to the extent this causes a material adverse financial impact on the Design Professional.
6.1.4 Damage to Project caused by fire, windstorm, or Act of God.
6.1.5 Physical presence at the Project Site beyond that required in Article 3.
Compensable. If more than one 8-hour shift is in operation during a 24-hour period and overlapping of shifts to permit time off for a meal is not feasible, an on-the-job meal period of 20 minutes is authorized and included in the regularly scheduled tour of duty. Workers must spend their on-the-job meal period at or near their work station. When possible, the meal period will be uninterrupted. Under these conditions, the time covered by the 20 minutes on-the-job period is compensable.
