Compaction Method. All Gravel As needed 20 CY N/A finished depth checks for the placed and compacted aggregate . Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31. CT5.32# - ROAD MAINTENANCE DEPOSIT SCHEDULE (08/2012) Other provisions herein notwithstanding, when Forest Service requests payment in lieu of Contractor's performance of road maintenance, Contractor shall make Required Deposits (16 USC 537) for current and/or deferred road maintenance. Such deposits are based on the estimated volume and distance hauled and Contractor's commensurate use of each road listed in the Road Maintenance Plan in CT5.31#. Contractor and Forest Service may agree in writing on adjustment of such rates. If Contractor uses roads under jurisdiction of Forest Service other than those listed in the Road Maintenance Plan, Forest Service shall establish rates commensurate with Contractor's use of such roads. The Required Deposits for Forest Service work in lieu of Contractor performance are N/A per CCF for recurrent maintenance, and $.18 per CCF for deferred maintenance. The following table lists who Contractor will make deposits for road maintenance to, and the rate per unit of measure of the deposit. The Road Maintenance Agreement is available for inspection at the Forest Supervisor's Office. CT5.33# - SNOW REMOVAL (06/2009) Snow removal shall be done in a manner that will preserve and protect roads, provide for safe and efficient transport of timber, and prevent erosion damage to streams and adjacent lands. In performing snow removal, Contractor shall adhere to the following performance standards, unless otherwise agreed: Blade will be equipped with skid shoes to prevent loss of surfacing and damage to the road bed. On gravel and native surface roads, a minimum four (4) -inch depth compacted snow mat shall be maintained on the roadbed during blading. Snow shall be removed from the entire road width, including turnouts. Snow berms shall be reduced at road intersections where plowed road segements join unplowed road segments. Reduce the piled snow in the roadway to create a smooth transition from plowed road to normal snow depth. Openings shall be created in snow berms as needed for proper drainage. Remove snow, ice, and debris from culverts and other drainage structures as needed to ensure efficient flow of water. Tracked or cleated vehicles shall not be used for snow removal without prior written approval of Forest Service Representative. CT6.24# - SITE SPECIFIC SPECIAL PROTECTION MEASURES. (07/2022) Unless agreed otherwise, the following special protection measures apply: Designation methods:
Appears in 1 contract
Sources: Integrated Resource Timber Contract
Compaction Method. All Gravel As needed 20 CY 40 cu yds N/A 3.3 Variations. The Purchaser will be required to furnish weight tickets to the FS for each load of commercially obtained crushed aggregate prior to the final inspection. For aggregate purchased from the government, a count of truck loads will be required in addition to finished depth checks for the placed and compacted aggregate aggregate. Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31. CT5.32# - ROAD MAINTENANCE DEPOSIT SCHEDULE (08/2012) Other provisions herein notwithstanding, when Forest Service requests payment in lieu of Contractor's performance of road maintenance, Contractor shall make Required Deposits (16 USC 537) for current and/or deferred road maintenance. Such deposits are based on the estimated volume and distance hauled and Contractor's commensurate use of each road listed in the Road Maintenance Plan in CT5.31#. Contractor and Forest Service may agree in writing on adjustment of such rates. If Contractor uses roads under jurisdiction of Forest Service other than those listed in the Road Maintenance Plan, Forest Service shall establish rates commensurate with Contractor's use of such roads. The Required Deposits for Forest Service work in lieu of Contractor performance are N/A per CCF for recurrent maintenance, and $.18 .26 per CCF for deferred maintenance. The following table lists who Contractor will make deposits for road maintenance to, and the rate per unit of measure of the deposit. The Road Maintenance Agreement is available for inspection at the Forest Supervisor's Office. CT5.33# - SNOW REMOVAL (06/2009) Snow removal shall be done in a manner that will preserve and protect roads, provide for safe and efficient transport of timber, and prevent erosion damage to streams and adjacent lands. In performing snow removal, Contractor shall adhere to the following performance standards, unless otherwise agreed: Blade will be equipped with skid shoes to prevent loss of surfacing and damage to the road bed. On gravel and native surface roads, a minimum four (4) -inch depth compacted snow mat shall be maintained on the roadbed during blading. Snow shall be removed from the entire road width, including turnouts. Snow berms shall be reduced at road intersections where plowed road segements join unplowed road segments. Reduce the piled snow in the roadway to create a smooth transition from plowed road to normal snow depth. Openings shall be created in snow berms as needed for proper drainage. Remove snow, ice, and debris from culverts and other drainage structures as needed to ensure efficient flow of water. Tracked or cleated vehicles shall not be used for snow removal without prior written approval of Forest Service Representative. CT6.24# - SITE SPECIFIC SPECIAL PROTECTION MEASURES. (07/2022) Unless agreed otherwise, the following special protection measures apply: Designation methods:
Appears in 1 contract
Sources: Integrated Resource Timber Contract