Certification and Testing. To the extent any product specifications require any certification and/or testing of the product provided hereunder, testing results and applicable certifications must be provided with each batch and/or shipment of product provided hereunder.
AutoNDA by SimpleDocs
Certification and Testing. Gizmondo shall, as required, submit each Product for testing and certification by an appropriate testing facility, in-house Quality Assurance department or Gizmondo certification department. All testing fees shall be paid by Gizmondo. In the event any Product is not certified due to its failure to meet applicable standards set-forth by the certifying entity or body, Gizmondo shall at its sole expense, make such revisions and further modifications until such time as the Product is certified.
Certification and Testing. To the extent any product specifications or laws require any certification and/or testing of the Product provided hereunder, or certification is customarily provided under generally accepted industry practices, such as a "listing" issued by Underwriters Laboratories, Inc. for plug-in electrical products, testing results and applicable certifications issued in the name of Xxxxxxx Group or its applicable affiliate must be provided with each batch and/or shipment of product provided hereunder. Seller shall (a) not take any action that could undermine the integrity of the laboratory test data, and (b) assure that no undue influence be exerted on testing laboratories or third-party certification bodies.
Certification and Testing. The contractor shall certify the pipe meets all design requirements. The Contractor shall pressure test the fabricated pipe prior to pullback and after installation is, completed in accordance with AWWA C906 and manufacturer recommendations. The testing pressure shall be 125% of maximum design pressure for the duration of 2 hours. Pass a pig through the entire reach of HDPE pipe. The OD of the pig shall be 95% of the nominal ID of pipe. The Contractor shall be responsible for the design of installation using HDD or other methods. The Contractor shall furnish all of the technical expertise and effort required to perform any necessary additional subsurface investigations and to prepare design drawings.

Related to Certification and Testing

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes.

  • Certification of Compliance The Owner may permit the use, prior to sampling and testing, of certain materials or assemblies when accompanied by manufacturer's certificates of compliance stating that such materials or assemblies fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer. Each lot of such materials or assemblies delivered to the work must be accompanied by a certificate of compliance in which the lot is clearly identified. Materials or assemblies used on the basis of certificates of compliance may be sampled and tested at any time and if found not to be in conformity with contract requirements will be subject to rejection whether in place or not. The form and distribution of certificates of compliance shall be as approved by the Owner. When a material or assembly is specified by "brand name or equal" and the Contractor elects to furnish the specified "brand name", the Contractor shall be required to furnish the manufacturer's certificate of compliance for each lot of such material or assembly delivered to the work. Such certificate of compliance shall clearly identify each lot delivered and shall certify as to:

  • COMPLIANCE AND CERTIFICATION 25.1 Each Party shall comply at its own expense with all Applicable Laws that relate to that Party’s obligations to the other Party under this Agreement. Nothing in this Agreement shall be construed as requiring or permitting either Party to contravene any mandatory requirement of Applicable Law.

  • Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority.

  • AS9100 Certification ‌ AS9100 Certification, specifies requirements for a quality management system to demonstrate the Contractor’s ability to consistently meet the customer requirements as well as statutory and regulatory requirements for the aerospace industry. An AS9100 Certification, is not mandatory; however, Contractors who desire to compete for work within the aerospace industry are encouraged to have AS9100 Certification, during the entire term of OASIS. The Contractor shall notify the OASIS CO, in writing, if there are any changes in the status of their AS9100 Certification, and provide the reasons for the change and copies of audits from an AS9100 Certification Body, as applicable. If only part of a Contractor’s organization is AS9100, certified, the Contractor shall make the distinction between which business units or sites and geographic locations have been certified.

  • Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC.

  • Recertification Upon expiration of the time period which the health care provider originally estimated that the employee needed for his/her own serious health condition, the City may require the employee to obtain recertification if additional leave is requested.

  • RECYCLING CERTIFICATION The Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the Public Contract Code Section 12200, in products, materials, goods, or supplies offered or sold to the State regardless of whether the product meets the requirements of Public Contract Code Section 12209. With respect to printer or duplication cartridges that comply with the requirements of Section 12156(e), the certification required by this subdivision shall specify that the cartridges so comply (Pub. Contract Code §12205).

  • CERTIFICATION CLAUSES The CONTRACTOR CERTIFICATION CLAUSES contained in the document CCC 04/2017 are hereby incorporated by reference and made a part of this Agreement by this reference as if attached hereto.