CABLE ROUTE Clause Samples

CABLE ROUTE. Lessor, in further consideration of the rents to be paid and the covenants herein contained, hereby leases to Lessee the Cable Route as reasonably determined by Lessor, for the limited purpose of installing, maintaining or repairing the Cabling in accordance with this Agreement; and to pass through portions of the Lessor's Property designated by Lessor for ingress to and egress from the Cable Route. All site work for the use of the Cable Route shall be performed by Lessee and at the expense of Lessee.
CABLE ROUTE. FOCAS and ▇▇▇ estimate that the portion of the Revenue Sharing Route for which FOCAS has responsibility under this Agreement will extend a distance of ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ when the System is completed. In the event Working Drawings for the Cable Route project the total distance of the Cable Route will exceed such estimate by more than 10 Route Miles, or fall short of such estimate by more than 10 Route Miles, FOCAS and ▇▇▇ shall meet expeditiously to discuss and negotiate in good faith the effect of such overage or shortfall. Among other things, FOCAS and ▇▇▇ may agree to modify the projected Cable Route, adjust the Payment Factor identified in Section 4.1, or modify other financial considerations between them as described in this Agreement.

Related to CABLE ROUTE

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Route As set forth in 47 C.F.R. § 51.319(e), a “Route” is a transmission path between one of Verizon's Wire Centers or switches and another of Verizon's Wire Centers or switches. A route between two points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) may pass through one or more intermediate Wire Centers or switches (e.g., Wire Center or switch “X”). Transmission paths between identical end points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) are the same “route,” irrespective of whether they pass through the same intermediate Wire Centers or switches, if any.

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 ▇▇▇▇▇ per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts.