BUILDING INSULATION Clause Samples
The Building Insulation clause sets out the requirements and standards for insulating a building as part of a construction project. It typically specifies the type, thickness, and placement of insulation materials to be used in walls, roofs, and floors, ensuring compliance with energy efficiency regulations and project specifications. By clearly defining insulation expectations, this clause helps prevent disputes over material quality and performance, and ensures the finished building meets thermal performance and regulatory standards.
BUILDING INSULATION. Roof insulation -- provide R-11 rigid insulation on the roof.
BUILDING INSULATION. Tenant improvement interior spaces are to have insulation as follows:
a. Exterior Building walls are to be furred with R-13 batt insulation.
b. Demising walls between conditioned and non-conditioned spaces are to have R-13 batt insulation.
c. Conditioned spaces at the underside of the building roof are to have R-19 batt insulation.
BUILDING INSULATION. The overall building thermal envelope shall conform to the requirements of the Minnesota Energy Code.
BUILDING INSULATION. A. R-19 Insulation at the roof deck.
BUILDING INSULATION. A. Building insulation shall be provided as follows:
1. Provide R-19 Batt insulation at the roof throughout
2. Provide R-11 Batt insulation at all furred exterior walls.
B. Provide sound attenuation batt insulation at all perimeter walls of conference rooms and toilet cores.
BUILDING INSULATION. The overall building thermal envelope shall conform to the requirements of the Minnesota Energy Code.
A. Exterior pre-cast walls: Exterior pre-cast wall panels shall include 2-1/2" of expanded polystyrene insulation to provide an approximate overall R value of 12.
BUILDING INSULATION a. The General Trades Contractor shall furnish and install Building Thermal And Acoustical Insulation as required to complete its Scope of Work as noted on the Contract Documents except for the below grade rigid building insulation at the foundation walls and footings completed by the Sitework Subcontractor. Include acoustical insulation at the new walls and ceilings of all toilet rooms even if it is not shown in the drawings.
b. Provide and install all insulation at all buildings required to complete project. This includes but is not limited to thermal and acoustical insulation as specified at:
i. Exterior walls ii. Interior walls iii. Voids at doors and windows