Common use of Building Information Modeling Clause in Contracts

Building Information Modeling. The Project Architect shall utilize Building Information Modeling (BIM) authoring software and BIM based design processes to produce model(s) for this project including all structure, walls, doors, openings, and mechanical, electrical, plumbing equipment/distribution systems. The BIM model(s) shall be utilized for all formal design reviews and presentations (Schematic, Design Development and Final Construction Documents). The BIM software shall be compliant with Industry Foundation Class (IFC) file format.

Appears in 7 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Building Information Modeling. The Project Architect BIM): Construction Manager shall collaborate with the Professional to establish a BIM execution plan for the project, identifying uses and processes that add value to the project. Construction Manager to determine and outline model protocols with the Professional. At a minimum, Construction Manager shall utilize Building Information Modeling (BIM) authoring software and BIM based design processes to produce model(s) for this project including all structure, walls, doors, openingsthe M.E.P. coordination process, and mechanical, electrical, plumbing equipment/distribution shall provide the Owner with fully coordinated as-builts of the building systems. The Construction Manager shall ensure that this BIM model(s) shall be utilized for all formal design reviews and presentations (Schematicprocess is properly included in the Trade Contractor bid packages, Design Development and Final Construction Documents)as applicable. The Refer to BIM software shall be compliant with Industry Foundation Class (IFC) file formatAddendum Exhibit.

Appears in 1 contract

Samples: Maximum Price Agreement

Building Information Modeling. The Project Architect shall utilize Building Information Modeling (BIM) authoring software development and execution of a BIM based design processes to produce model(s) Management Plan for this the project including all structurewhich will outline the intended model use and how it will be shared with the Construction Manager, wallsOwner, doorsVendors and building contractors. Architecture, openingsMEP, and mechanical, electrical, plumbing equipment/distribution systemsStructural disciplines will work within a BIM model for the project. The Landscape Architecture and Civil will work in CAD. BIM model(s) shall services include modeling for the design and preliminary coordination of building elements and will aid in the generation of contract documents. Additional BIM goals and uses for the CM or Owner will be utilized for all formal design reviews and presentations (Schematic, Design Development and Final Construction Documents). The BIM software shall be compliant with Industry Foundation Class (IFC) file formatan additional service.

Appears in 1 contract

Samples: West Lafayette Rec Center

Building Information Modeling. The Project “BIM”) - Take any and appropriate actions during the Schematic Design Phase so as to enable Architect shall utilize Building Information Modeling (BIM) authoring software and to provide the BIM based services required during all subsequent design processes to produce model(s) for this project including all structure, walls, doors, openings, and mechanical, electrical, plumbing equipment/distribution systems. The BIM model(s) shall be utilized for all formal design reviews and presentations (Schematic, Design Development and Final Construction Documents). The BIM software shall be compliant with Industry Foundation Class (IFC) file formatphases.

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Building Information Modeling. APPROACH The Project Architect shall utilize Building Information Modeling Parties may establish a building information modeling (BIM) authoring software approach to design and BIM based design processes to produce model(s) for this project including all structureconstruction of the Project, wallsproviding continuous and immediate availability of reliable, doorsintegrated and coordinated design, openingsscope, schedule and cost information. The use of a building modeling approach, and mechanicalthe processes and technologies necessary to fully utilize such an approach, electrical, plumbing equipment/distribution systems. The BIM model(s) shall be utilized for all formal design reviews established as an addendum to this Agreement. If a BIM approach is elected, the Management Group shall establish the BIM parameters, standards and presentations (Schematic, Design Development and Final Construction Documents). The BIM software shall be compliant with Industry Foundation Class (IFC) file formattechnological requirements.

Appears in 1 contract

Samples: www.leanconstruction.org

Time is Money Join Law Insider Premium to draft better contracts faster.