Common use of BUILDING ACTIVITIES Clause in Contracts

BUILDING ACTIVITIES. 18.1 Prior to any construction work taking place on Site, all missing erf pegs have to be re-instated and aland 18.2 Excavation for foundations and/or walls adjoining roadways and/or sidewalks must be undertaken with caution and, in particular, the roadway/sidewalk mustbe protected and supported during excavations. Any damage caused to the roadway/sidewalk must be made good by the Building Contractor immediately once the damage becomes evident. 18.3 All refuse, litter, plastic bags, cement bags, packaging material etc must be collected daily and placed in bags and removed from the Estate regularly (at least once a week) or placed in waste bins with properly fitted lids supplied by the Building Contractor at the Building Contractor’s cost. The Building Contractor shall generally ensure that the Erf is at all times kept neat and free of litter or other unsightly waste. 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the Developer/HOA. Should the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the Building Contractor. The Building Contractor will be denied access to the Estate until such costs have been paid in full. 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA. 18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail to keep the Erf in an acceptable state, the Developer and/or the HOA shall, without prejudice to its other rights, have the right to clean the Site the costs whereof shall be for the account of the Owner/Building Contractor. 18.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate or any surrounding area. The Building Contractor shall make arrangements for disposing of materials at a spoil site off the Estate. 18.8 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor 18.9 All construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 18.10 Washing of vehicles and equipment will not be allowed on the Estate. 18.11 No fires will be allowed on any part of the Estate. Fire extinguishers are required to be on the Site at all times. Breach: (See Penalties and Tariffs Document) > No waste bins on Site – penalty. > Waste bin not complying to regulations – penalty. > Overflowing waste bins – penalty. > Refuse dumped in Estate skip and/or other place within the estate – penalty. > Dumping building waste in estate skips – penalty. > Dumping excavation soil in a place other than the allocated area – penalty. > Erf not kept in an acceptable tidy state – penalty per day.

Appears in 1 contract

Sources: Building Contractor's Code of Conduct Agreement

BUILDING ACTIVITIES. 18.1 Prior to any construction work taking place on Site, all missing erf pegs have to be re-instated and aland 18.2 19.1 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk mustbe must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the Building Contractor immediately once the damage becomes evident. 18.3 19.2 All refuse, litter, plastic bags, cement bags, packaging material etc refuse must be collected daily and daily, placed in bags which are the to be placed in green (no other colour permitted) waste bins and the refuse shall be removed from the Estate Development regularly (at least once a week) or placed in waste . Waste bins with which must have lids which properly fitted lids seal the bins shall be supplied by the Building Contractor at the Building Contractor’s cost. Without detracting from the generality of the aforegoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be removed from the Development so as not to contaminate the Olive ▇▇▇▇▇▇, the dams and wetlands. 19.3 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the HOA. 19.4 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the HOA. 19.5 The Building Contractor shall generally ensure that the Erf is at all times kept neat and free of litter or other unsightly waste. 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the Developer/HOA. Should 19.6 If the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the Building Contractor. The Building Contractor will be denied access to the Estate until such costs have been paid in full. 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA. 18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail fails to keep the Erf in an acceptable stateacceptably tidy state or fails to have the rubble removed, the Developer and/or then the HOA shall, without prejudice to its other rights, have the right to clean the Site site and/or remove the rubble the costs whereof shall be for the account of the Owner/Building Contractor. 18.7 19.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate Development, including the Olive ▇▇▇▇▇▇ or any surrounding area. The area and the Building Contractor shall is required to make his own arrangements for disposing of materials at a spoil site off the EstateDevelopment. 18.8 19.8 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor 18.9 19.9 All activities relating to the house construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 18.10 19.10 The Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the Building Contractor. The Building Contractor will be denied access to the Development such costs have been paid in full. 19.11 Washing of vehicles and equipment will not be allowed on the EstateDevelopment and must be carried out elsewhere. 18.11 19.12 No fires will be allowed on any part of the EstateDevelopment. Fire extinguishers and a 30 (thirty) meter garden hose with the necessary connections are required to be kept on the Site Erf site at all times. 19.13 The Building Contractor will be required to screen off the Erf with a 1,8m high black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the HOA in the following circumstances, (i) where there is no screening between the Erf under construction and the adjacent property, (ii) where the Erf is not in an acceptable standard of tidiness determined by the HOA. Breach: (See Penalties and Tariffs Document) > No waste bins on Site site R1 000,00 penalty. > Waste bin not complying to regulations – R500,00 penalty. > Overflowing waste bins – R500,00 penalty. > Refuse dumped in Estate skip and/or other place within the estate – R1 000,00 penalty. > Dumping building waste in estate skips – R1 500,00 penalty. > Dumping excavation soil in a an place other than the allocated area – R2 000,00 penalty. > Erf not kept in an acceptable tidy state – penalty R500,00 per day.

Appears in 1 contract

Sources: Building Contractor's Code of Conduct Agreement

BUILDING ACTIVITIES. 18.1 Prior to any construction work taking place on Sitesite, all missing erf Erf pegs have to be re-instated reinstated and alandpointed out to the Building Contractor. During this site meeting, a land surveyor’s certificate (confirming position of the pegs) has to be handed to the inspector, as well. 18.2 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk mustbe must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the Building Contractor immediately once the damage becomes evident. 18.3 All refuse, litter, plastic bags, cement bags, packaging material etc refuse must be collected daily and placed in bags and removed from the Estate Development regularly (at least once a week) or placed in waste bins with (must have properly fitted lids lids) supplied by the Building Contractor at the Building Contractor’s cost. Without detracting from the generality of the a foregoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be removed from the Development so as not to contaminate the Estate, the dams and wetlands. 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the HOA/Building Control Contractor. 18.5 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the HOA/Building Control Contractor. 18.6 The Building Contractor shall generally ensure that the Erf is at all times kept neat and free of litter or other unsightly waste. 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the Developer/HOA. Should 18.7 If the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the Building Contractor. The Building Contractor will be denied access to the Estate until such costs have been paid in full. 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA. 18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail fails to keep the Erf in an acceptable stateacceptably tidy state or fails to have the rubble removed, then the Developer and/or the HOA HOA/Building Control Contractor shall, without prejudice to its other rights, have the right to clean the Site site and/or remove the rubble, the costs whereof thereof shall be for the account of the Owner/Building Contractor. 18.7 18.8 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate Development or any surrounding area. The area and the Building Contractor shall contractor is required to make his own arrangements for disposing of materials at a spoil site off the EstateDevelopment. 18.8 18.9 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor. 18.9 18.10 All activities relating to the house construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 18.10 18.11 The Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the Building Contractor. The Building Contractor will be denied access to the Development until such costs have been paid in full. 18.12 Washing of vehicles and equipment will not be allowed on the EstateDevelopment and must be carried out elsewhere. 18.11 No 18.13 NO fires will be allowed on any part of the EstateDevelopment. Fire extinguishers are required to be on the Site Erf site at all times. Breach: (See Penalties and Tariffs Document) > No waste bins on Site site R1000.00 penalty. > Waste bin not complying too regulations (needs to regulations be emptied weekly) R500.00 penalty. > Overflowing waste bins – R500.00 penalty. > Refuse dumped in Estate skip and/or and /or other place within the estate – R1000.00 penalty. > Dumping building waste in estate skips – R1500.00 penalty. > Dumping excavation soil in a place other than the allocated area – R2000.00 penalty. > Erf not kept in an acceptable tidy state – penalty R500.00 per day.

Appears in 1 contract

Sources: Building Contractor's Code of Conduct Agreement

BUILDING ACTIVITIES. 18.1 Prior to any construction work taking place on Site, all missing erf pegs have to be re-instated and aland 18.2 16.1 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk mustbe must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the Building Contractor BUILDING CONTRACTOR immediately once the damage becomes evident. 18.3 16.2 All refuse, litter, refuse and litter including cement bags and plastic bags, cement bags, packaging material etc bags must be collected daily and placed in bags and removed from the Estate DEVELOPMENT regularly (at least once a week) or placed in waste bins with properly fitted lids bins/containers securely covered when site is vacated. These bins/ containers are to be supplied by the Building Contractor BUILDING CONTRACTOR at the Building Contractor’s BUILDING CONTRACTOR's cost. The Building Contractor bins/ containers must be emptied and the contents removed from the Estate at appropriate intervals, but in any event, not less than once a week. The burning of rubbish and fires generally are not permitted under any circumstances. 16.3 The BUILDING CONTRACTOR shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPER/HOA. 16.4 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate manager. 16.5 The BUILDING CONTRACTOR shall generally ensure that the Erf ERF is at all times kept neat and free of litter or other unsightly waste. 18.4 16.6 If the BUILDING CONTRACTOR fails to keep the ERF in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER and/or the HOA shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTOR. 16.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT or any surrounding area and the BUILDING CONTRACTOR is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENT. 16.8 Throughout the construction/erection of the IMPROVEMENTS effective dust control measures must be implemented by the BUILDING CONTRACTOR. 16.9 All activities relating to the house construction must be confined to within the ERF boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 16.10 Unless written permission to encroach onto adjacent site(s)/▇▇▇▇▇ has been obtained from the adjacent site/erf owner(s) and lodged with the HOA: 16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and 16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites. 16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced. 16.10 The Building Contractor shall ensure that BUILDING CONTRACTOR will be expected to keep the appearance of his building site neat and tidy at all building rubble is times. Litter must be removed from the site on a weekly basis daily basis. No litter may be stored or as otherwise required by the Developer/HOAmixed in amongst building rubble. Should the Building Contractor BUILDING CONTRACTOR not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the Building ContractorBUILDING CONTRACTOR. The Building Contractor BUILDING CONTRACTOR will be denied access to the Estate DEVELOPMENT until such costs have been paid in full. 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA. 18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail to keep the Erf in an acceptable state, the Developer and/or the HOA shall, without prejudice to its other rights, have the right to clean the Site the costs whereof shall be for the account of the Owner/Building Contractor. 18.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate or any surrounding area. The Building Contractor shall make arrangements for disposing of materials at a spoil site off the Estate. 18.8 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor 18.9 All construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 18.10 16.11 Washing of vehicles and equipment will not be allowed on the EstateDEVELOPMENT and must be carried out elsewhere. 18.11 16.12 No fires will be allowed on any part of the EstateDEVELOPMENT. Fire extinguishers are required to be on the Site ERF site at all times. 16.13 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. Breach: If a corrugated iron structure is used it must be painted dark green. 16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. The HOA reserves the right to replace plant material at the owner's expense should material be damaged. 16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand. 16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (See Penalties minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside. 16.17 Owners and Tariffs Document) > contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ No waste bins on Site site R1 000.00 penalty. > Waste bin not complying to regulations – R500.00 penalty. > Overflowing waste bins – R500.00 penalty. > Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 penalty. > Dumping building waste in estate skips – R1 500.00 penalty. > Dumping excavation soil in a an place other than the allocated area – penalty. > Erf R2 000.00 penalty ▪ ERF not kept in an acceptable tidy state – penalty R500.00 per day.

Appears in 1 contract

Sources: Building Contractor's Code of Conduct Agreement

BUILDING ACTIVITIES. 18.1 19.1 Prior to any construction work taking place on Sitesite, all missing erf pegs have to be re-re- instated and alandpointed out to the estate-building inspector. During this site meeting, a land surveyor’s certificate (confirming position of the pegs) has to be handed to the inspector, as well. 18.2 19.2 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk mustbe must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the Building Contractor immediately once the damage becomes evident. 18.3 19.3 All refuse, litter, plastic bags, cement bags, packaging material etc refuse must be collected daily and placed in bags and removed from the Estate Development regularly (at least once a week) or placed in waste bins with bins(must have properly fitted lids lids) supplied by the Building Contractor at the Building Contractor’s cost. Without detracting from the generality of the a foregoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be removed from the Development so as not to contaminate the Vineyards, the dams and wetlands. 19.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the Developer/HOA. 19.5 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the Developer. 19.6 The Building Contractor shall generally ensure that the Erf is at all times kept neat and free of litter or other unsightly waste. 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or as otherwise required by the Developer/HOA. Should 19.7 If the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the Building Contractor. The Building Contractor will be denied access to the Estate until such costs have been paid in full. 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA. 18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail fails to keep the Erf in an acceptable stateacceptably tidy state or fails to have the rubble removed, then the Developer and/or the HOA shall, without prejudice to its other rights, have the right to clean the Site site and/or remove the rubble the costs whereof shall be for the account of the Owner/Building Contractor. 18.7 19.8 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate Development, including the Vineyards or any surrounding area. The area and the Building Contractor shall is required to make his own arrangements for disposing of materials at a spoil site off the EstateDevelopment. 18.8 19.9 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor 18.9 19.10 All activities relating to the house construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 18.10 19.11 The Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the Building Contractor. The Building Contractor will be denied access to the Development such costs have been paid in full. 19.12 Washing of vehicles and equipment will not be allowed on the EstateDevelopment and must be carried out elsewhere. 18.11 19.13 No fires will be allowed on any part of the EstateDevelopment. Fire extinguishers are required to be on the Site ERF site at all times. Breach: (See Penalties and Tariffs Document) > No waste bins on Site – penalty. > Waste bin not complying to regulations – penalty. > Overflowing waste bins – penalty. > Refuse dumped in Estate skip and/or other place within the estate – penalty. > Dumping building waste in estate skips – penalty. > Dumping excavation soil in a place other than the allocated area – penalty. > Erf not kept in an acceptable tidy state – penalty per day.

Appears in 1 contract

Sources: Building Contractor's Code of Conduct Agreement