Common use of Bituminous constructions Clause in Contracts

Bituminous constructions. (a) For Bituminous constructions other than wearing course, where the surface is low, the deficiency shall be corrected by the adding fresh material and recompacting specifications, where the surface is high the full depth of the layer shal bo removed and replaced with fresh material and compacted . to specifications. (b) For wearing course, where the surface is nigh or low the full depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all case where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 metre and less than 1 land wide 8-25 TRAFFIC REGULATIONS (a) Clause 112 of the SSRB shall apply to the whole works Tippers, trucks, Water Lorries to which when not in actual ▇▇▇▇ Shall be drawn ~Iear off thl? ro3rl. the c;afpt~1 to thp rllhlic an prpcal.ltionary meRsures shall be taken by way of lighting with bright red light and warnig boards. The contractor shall maintain watchman on the works and control and regulate traffic. If an where necessary. Notice boards shall be placed in suitable locations bearing in large letters in conspicuous columns. Warning notices shall be placed at the points in the neighbourhood of the work where other roads join and across the road and at such other places and points as may be directed to enable the motoists cyclists. . or other vehicular traffic, avoid the obstructed road by taking alternative routes. Extra payment will not be made for any such incidental items. . (b) penalty for not arranging traffic regulations: If the contractor fails to make arrarigements for traffic regulations as described in condition 8- 25 (a) a penalty of Rs500- day will be imposed on the contractor. 8-26 Cement and steel M.S./R.T.S will be supplied to the Contractor by the Corporation, (If and when available) at the rate of Rs /- per tonne, M.S. Rs /- per Tonne R.T.S. Rs /- per tonne, respectively and the cost recovered from the bills of the contractor for the work. The contractor wjll have to arrange for carting from the specified Corporation store yard at their own cost for car1ing the same to work site. The contractor's rate for the respective items involving cement. and steel should inclusive the cost of conveyance from the sources of departmental supply to the Workspot. The contractor shall not claim any compensation for non-supply of cement and steel by the departments.

Appears in 1 contract

Sources: Construction Contract

Bituminous constructions. (a) For Bituminous constructions other than wearing course, where the surface is low, the deficiency shall be corrected by the adding fresh material and recompacting specifications, where the surface is high the full depth of the layer shal bo removed and replaced with fresh material and compacted . to specifications. (b) For wearing course, where the surface is nigh or low the full depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all case where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 metre and less than 1 land wide 8-25 TRAFFIC REGULATIONS (a) Clause 112 of the SSRB shall apply to the whole works Tippers, trucks, Water Lorries to which when not in actual ▇▇▇▇ Shall be drawn ~Iear off thl? ro3rl. the c;afpt~1 to thp rllhlic an prpcal.ltionary meRsures shall be taken by way of lighting with bright red light and warnig boards. The contractor shall maintain watchman on the works and control and regulate traffic. If an where necessary. Notice boards shall be placed in suitable locations bearing in large letters in conspicuous columns. 49 Signature of the Tenderer Warning notices shall be placed at the points in the neighbourhood of the work where other roads join and across the road and at such other places and points as may be directed to enable the motoists cyclists. . or other vehicular traffic, avoid the obstructed road by taking alternative routes. Extra payment will not be made for any such incidental items. . (b) penalty for not arranging traffic regulations: If the contractor fails to make arrarigements for traffic regulations as described in condition 8- 25 8-25 (a) a penalty of Rs500- day will be imposed on the contractor. 8-26 Cement and steel M.S./R.T.S will be supplied to the Contractor by the Corporation, (If and when available) at the rate of Rs /- per tonne, M.S. Rs /- per Tonne R.T.S. Rs /- per tonne, respectively and the cost recovered from the bills of the contractor for the work. The contractor wjll have to arrange for carting from the specified Corporation store yard at their own cost for car1ing the same to work site. The contractor's rate for the respective items involving cement. and steel should inclusive the cost of conveyance from the sources of departmental supply to the Workspot. The contractor shall not claim any compensation for non-supply of cement and steel by the departments.

Appears in 1 contract

Sources: Tender Agreement