BEMS INTERFACE Sample Clauses
BEMS INTERFACE. A. Building Energy Management System (BEMS) contractor shall commission all Terminal boxes and other related equipment included in Tenant Construction.
1. Upon completion of air and water balance, BEMS technicianwill conduct upload from all new Controllers to the Main Control Module (MCM) so that entered data is backed up and reloadable in case of TEC failure or memory loss.
2. BEMS technician will check communication to all new equipment and verify proper application, operation and equipment designation number. BEMS addresses for Controllers are to match number assignment on the field and field labels.
3. A floor graphic interface shall be amended or developed showing area serviced by new equipment on the floor in which it is located. Match design of existing BEMS graphics.
a. Use architectural CAD drawing of Tenant Construction Space as a background.
b. Floor graphic shall have a link back to the Main Directory Graphic at upper left corner.
c. Floor graphic shall have links to a graphic for each controller on the floor. All Controller links are to be labeled to match equipment designation number.
d. Use contrasting colors to beUer depict demarcation lines for each area served on floor by Controllers.
e. Graphics interface to be completed and operational by Tenant move-in date.
f. Coordinate access to BEMS front end and graphics installation with Building Chief Engineer or designee.
g. Add VAV boxes and AC/HP units to summary graphics screen with all currently listed operation parameters.
4. Confirmation and calibration of flow and energy meters. Lighting Control System Light Fixture Cutsheets Simplex Fire Protection Cutsheets
