Batch Plant Sample Clauses

Batch Plant. The manufacturing of asphalt or concrete which may include the storage of related component materials.
AutoNDA by SimpleDocs
Batch Plant. Lessee may erect a concrete batch plant and wash down sump on the west or south side of Building #7 in accordance with plans approved by Lessor, such approval not to be unreasonably withheld or delayed. Lessee's plans shall include, but not be limited to, the precise area to be occupied, the design of the structure and final paint color. All construction shall be subject to environmental approvals, governmental approvals and building permits. On the termination of this Lease the Lessee may, and will, if so requested by Lessor, remove the batch plant and restore the area, including parking, to its prior condition. Lessee shall give notice to Lessor at least 30 days prior to the termination of this Lease as to whether or not it elects to remove the batch plant. Within 30 days after receipt of such notice or, if no notice is given, then within 30 days after the termination of this Lease, Lessor may notify Lessee that Lessee is required to remove the said batch plant
Batch Plant. NRMCA Program for Certification of Ready-Mixed Concrete Production Facilities or
Batch Plant. Modify the batch plant to measure the mass (weight) of the RAP and/ or RAS before adding it into the pug mill. Design the cold- feed bin (s), conveyor system (s), charging chute (s), and all special bins to prevent RAP and/ or RAS from segregating and sticking. Dry the virgin aggregate and RAM and then heat the virgin aggregate and RAM to a temperature that, after adding RAP and/or RAS, produces a completed mixture within the temperatures specified in Table A for the class and type of material used. Ensure that virgin aggregate is free of unburned fuel oil when delivered to the pug mill.
Batch Plant. Section 409.3(c)1 and add the following: Dry the aggregate (s) according to the specific recommendations and direction from the WMA Technology Technical Representative and heat to a suitable temperature so that the resulting completed mixture temperature is within the mixture temperature range established in the Producer QC Plan and recommended or directed by the WMA Technology Technical Representative or manufacturer and that is within the master minimum and maximum temperature range in Table A within this specification. Ensure that the aggregate is free of unburned fuel oil when delivered to the pug mill.
Batch Plant. When a batch type plant is used, add the aramid product dosage to the aggregate in the weigh xxxxxx. This may be done with loose fibers and a fiber metering device, or may be done by using manual dosing equipment. If necessary, increase the batch dry mixing time to ensure the aramid fibers are uniformly distributed prior to the injection of asphalt cement into the mixer.
Batch Plant. 6 13.2.2 Rail Line ....................................................6 13.2.3
AutoNDA by SimpleDocs
Batch Plant. Feed treated aramid with automated dosing machine operated by a certified QA/QC mixing technician, directly into the weigh xxxxxx. HMA/WMA batch dry mix times will need to be 20 seconds minimum to ensure proper aramid distribution. Metering shall be based on batch size (tons) and dosage rate (oz/ton). Feeding shall occur in a constant stream-like manner as the heated aggregate is added to the weigh xxxxxx. If necessary, increase the mixing time with heated aggregates to ensure the aramid fibers are uniformly distributed.

Related to Batch Plant

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • GMP The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est. COW): $ CM/GC Fee ( % of Est. COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Manufacturing Services Jabil will manufacture the Product in accordance with the Specifications and any applicable Build Schedules. Jabil will reply to each proposed Build Schedule that is submitted in accordance with the terms of this Agreement by notifying Company of its acceptance or rejection within three (3) business days of receipt of any proposed Build Schedule. In the event of Jabil’s rejection of a proposed Build Schedule, Jabil’s notice of rejection will specify the basis for such rejection. When requested by Company, and subject to appropriate fee and cost adjustments, Jabil will provide Additional Services for existing or future Product manufactured by Jabil. Company shall be solely responsible for the sufficiency and adequacy of the Specifications [***].

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

Time is Money Join Law Insider Premium to draft better contracts faster.