Common use of Basic Parameters Clause in Contracts

Basic Parameters. (1) Control drainage area: 58.2 square kilometers (km2). (2) Normal storage level and corresponding reservoir capacity: 803.5m, 6,950,000 cubic meters (m3). (3) Dead water level and corresponding reservoir capacity: 772m, 670,000 cubic meters (m3). (4) Designed flood level and corresponding reservoir capacity: 804.75m, 8,069,300 cubic meters (m3). (5) Check flood level and corresponding reservoir capacity: ___m, ___ cubic meters (m3). (6) Top level of flood control: ___m. (7) Beginning water level in flood season: ___m.

Appears in 1 contract

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp)

Basic Parameters. (1) Control drainage area: 58.2 336.4 square kilometers (km2). (2) Normal storage level and corresponding reservoir capacity: 803.5290 m, 6,950,000 300,000 cubic meters (m3). (3) Dead water level and corresponding reservoir capacity: 772288 m, 670,000 140,000 cubic meters (m3). (4) Designed flood level and corresponding reservoir capacity: 804.75290.44 m, 8,069,300 ____ cubic meters (m3). (5) Check flood level and corresponding reservoir capacity: ___292.11 m, ___ 55 cubic meters (m3). (6) Top level of flood control: ___m. (7) Beginning water level in flood season: ___m.

Appears in 1 contract

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp)

Basic Parameters. (1) Control drainage area: 58.2 269 square kilometers (km2). (2) Normal storage level and corresponding reservoir capacity: 803.5340 m, 6,950,000 850,000 cubic meters (m3). (3) Dead water level and corresponding reservoir capacity: 772338 m, 670,000 400,000 cubic meters (m3). (4) Designed flood level and corresponding reservoir capacity: 804.75340.96 m, 8,069,300 ____ cubic meters (m3). (5) Check flood level and corresponding reservoir capacity: ___343.25 m, ___ 158 cubic meters (m3). (6) Top level of flood control: ___m. (7) Beginning water level in flood season: ___m.

Appears in 1 contract

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp)

Basic Parameters. (1) Control drainage area: 58.2 8,872 square kilometers (km2). (2) Normal storage level and corresponding reservoir capacity: 803.536.5m, 6,950,000 24,240,000 cubic meters (m3). (3) Dead water level and corresponding reservoir capacity: 77236.0m, 670,000 22,280,000 cubic meters (m3). (4) Designed flood level and corresponding reservoir capacity: 804.7538.85m, 8,069,300 34,810,000 cubic meters (m3). (5) Check flood level and corresponding reservoir capacity: ___41.01m, ___ 4,575 cubic meters (m3). (6) Top level of flood control: ___m. (7) Beginning water level in flood season: ___m.

Appears in 1 contract

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp)

Basic Parameters. (1) Control drainage area: 58.2 162 square kilometers (km2). (2) Normal water storage level and corresponding reservoir capacity: 803.5472 m, 6,950,000 19,640,000 cubic meters (m3). (3) Dead water level and corresponding reservoir capacity: 772451 m, 670,000 5,110,000 cubic meters (m3). (4) Designed flood level and corresponding reservoir capacity: 804.75472.51 m, 8,069,300 ____ cubic meters (m3). (5) Check flood level and corresponding reservoir capacity: ___473.75 m, ___ 21,470,000 cubic meters (m3). (6) Top level of flood control: ___m. (7) Beginning water level in flood season: ___m.

Appears in 1 contract

Sources: Grid Connection and Dispatching Agreement (China Hydroelectric Corp)