BAS Upgrades Sample Clauses
BAS Upgrades. (15 facilities) Energy savings are generated by integration, optimization, and retro-commissioning of the Building Automation System (BAS). • ECM 2.01.B Dorm HVAC Replacements: replacing existing chilled water and hot water • ECMs 5.01 and 5.02 Interior and Exterior Lighting: adding efficient LED lighting • ECM 2.01A B3610 Chiller Plant Upgrades: replacing low-efficiency and aged equipment In Year 1, the project achieved $521,649 versus a guarantee of $503,015. This results a $18,634 excess of the savings guarantee. P1 Prevent Electrical Distribution Systems Damage Keeping trees and vegetation trimmed back away from electrical distribution lines not only reduces the occurrences of limb damage, but also reduces the number of outages caused by squirrels In 2017, SJAFB increased the right of way for the overhead electrical distribution system to a minimum 15 feet and we saw a significant reduction of power outages As expected, this not only prevents tree limbs from falling on lines during wind events and winter storms but prohibits squirrels from jumping from tree to line and subsequently damaging insulation, etc. resulting in unscheduled power outages P1 Electrical Distribution Systems
BAS Upgrades
