Automatic Transfer Switch Clause Samples

Automatic Transfer Switch. 3.6.1. The automatic transfer switch shall be sized to the maximum capacity of the emergency generator and have an ampere rating equal or greater than the rating of the engine mounted circuit breaker. 3.6.2. Transfer switch shall be complete with a user friendly control interface with a 128 x 63 graphical LCD display and intuitive symbols for ease of operation 3.6.3. Transfer switch shall be complete with LED indicators for transfer switch status. 3.6.4. Transfer switch shall be UL 1008, and CSA approved. 3.6.5. Transfer switch shall be 2 pole with solid neutral 3.6.6. Transfer switch shall be supplied with “in-phase” monitor, and “engine exerciser”. 3.6.7. Standard of Acceptance: ASCO, Series 300 complete with Accessories #11BE, and #22 and #27. 4. Execution
Automatic Transfer Switch. 1. Install transfer switch in accordance with manufacturer's instructions. 2. Provide engraved plastic nameplates. 3. Provide generator start/stop signal wiring and conduit from transfer switch to generator control panel. 4. Provide interconnection wiring with duplex pump control circuit to allow only one pump to run while on generator power. 5. Provide 120 volt power source for heater.
Automatic Transfer Switch. This section shall contain detailed information that defines particular Field Tests to be performed to verify that the Automatic Transfer Switch meets the requirements of the RFP.
Automatic Transfer Switch. Inspect ATS & enclosure for corrosion, moisture • Inspect controls and calibrate as needed • Exercise clock-check and verify operation • Record normal and emergency frequency/voltage at ATS connection • Perform power failure or building load test (with approval), check/ record amperage/voltage on each leg • Check transfer switch contacts for voltage drop(normal and emergency) • Retrun all switches into proper operating mode • Check all terminal connections for tightness • Re-torque connections, TS mounting, contact mounting and terminals strips • Inspect all insulation for degradation • Inspect barries and arc chutes • Inspect Transfer Switch coil, rectifier and resistors (OHMS) • Inspect the coil and contacts of: o Selector relay o Lockout relay o Arming relay o Voltage relay o Normal relay o Emergency relay o All other accessory relays • Inspect all timers • Inspect and infared arcing contacts where possible • Inspect and infared main contacts where possible • Inspect linkage and lubricate as needed • Clean the exposed Transfer Switch coil core and lubricate • Clean Transfer Switch enclosure and controls • Inspect and lubricate cabinet hardware for proper operation • Re-lubricate the Transfer Switch operator and pivot points • Replace defective indicator bulbs • Record utility voltage • Record utility amperage • Record peak amperage • Check for proper operation of the transfer switch, timers, relays, remote start contacts, exercisers, phase monitors, and record settings • Check for voltage drop across the main current carrying contacts • Check for excessive heat build-up with infared thermometer • Record emergency voltage • Record emergency frequency • Inspect all optional accessories • Inspect arcing contacts • Inspect main contacts • Inspect barrier and arc chutes • Inspect linkage and lubricate as needed • Check engine start bypass contacts for proper operation • Inspect all safety interlocks • Check closed transition bypass operation • Check alarm time delay settings • Replace 9V ATS batteries as needed • Submit inspection/ test report to owner, with any recommendations of future work/ parts required • Instruct owner personnel in operating or upkeep procedure Generac SG050 2109620 50kW Behind Building $740.00 Total $740.00 This agreement does not include expenses to repair damage caused by abuse, accident, theft, acts of a third person, forces of nature, or altering the equipment. EVAPAR, shall not be responsible for failure to render the service for...
Automatic Transfer Switch. A. Supply new automatic delayed transition transfer switch (ATS) and associated microprocessor-based control module. B. Switch Ratings: As indicated on the Drawings. C. Provide one (1) spare microprocessor controller (in addition to new microprocessor controller provided installed with new automatic transfer switch). D. Provide one (1) spare extension harnesses for ATS provided. Spare harness shall be in addition to new harness installed in new automatic transfer switch provided. E. New ATS shall consist of a power transfer switch unit which shall be provided in an outdoor, NEMA 3R, 316 stainless steel free-standing enclosure. Standby Power System Equipment – Corporation Yard Foster City/EMID 16233A-35 CIP 405-755 F. Provide new ATS enclosure and compartment with Fluke Model FLK-075-CLKT (no equal) “fisheye” viewports to allow for infrared scanning of the internal ATS components with the enclosure door in the closed position.