ATTACHMENT PERMITS Clause Samples

ATTACHMENT PERMITS. Before making an Attachment, McLeodUSA will obtain a permit to attach from AEREROWD using the procedure and forms attached hereto and incorporated herein by reference as Exhibit B. The Attachments must meet Alliant Energy Engineering Standards, copies of which will be provided to McLeodUSA. Alliant shall provide McLeodUSA with copies of any changes to such Engineering Standards which relate to McLeodUSA Attachments. Overlashing will be allowed with a separate permit from the AEREROW. Alliant shall conduct inspections to assure that McLeodUSA complies with such Alliant Energy Engineering Standards. McLeodUSA agrees to reimburse Alliant Energy for the cost of a field study, including but not limited to the cost of a pre-construction inspection by Alliant Energy personnel, engineering, planning any changes to the Alliant Energy equipment necessary to accommodate the Attachment, and the cost of a post-construction inspection. McLeodUSA, its subsidiaries and affiliates, agree that utilization of the Alliant Energy Network shall be limited to Telecommunications Purposes only. All telecommunications equipment must be installed and maintained by McLeodUSA according to the requirements of all applicable Federal, State and local codes and authorities, including but not limited to the Telecommunications Act of 1996.
ATTACHMENT PERMITS. Before making an attachment, ▇▇▇▇▇▇ will obtain a permit to attach from WP&L. The attachments must meet WP&L Engineering standards. WP&L will allow overlashing under the following conditions: Each instance of overlashing will require a separate permit from WP&L. ▇▇▇▇▇▇ will provide templates with loadings meeting WP&L engineering standards. ▇▇▇▇▇▇ agrees to reimburse WP&L for the cost of a field study, including but not limited to the cost of a pre-construction inspection by a WPL project manager, engineering, planning and any changes to WPL equipment necessary to accommodate the attachment, and the cost of a post-construction inspection, to determine what changes are necessary to make attachment space available for ▇▇▇▇▇▇. ▇▇▇▇▇▇, its subsidiaries and affiliates, agree that utilization of WPL's Network will be limited to telecommunications purposes only. All telecommunications equipment must be installed and maintained by ▇▇▇▇▇▇ according to the requirements of all applicable Federal, State and local codes and authorities, including but not limited to the Telecommunications Act of 1996.