Area 3B Sample Clauses

Area 3B. All Xxxxxxx-fir and hemlock trees less than 26 inches DBH and greater than 7 inches DBH.
AutoNDA by SimpleDocs

Related to Area 3B

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Short Description Post-Bachelor's

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Overtime Description Overtime Wage paid at time and one half the regular rate For "A" rated Apprentices (work in excess of 7 hours per day) For "M" rated Apprentices (work in excess of 8 hours per day) (Local #3) ELEVATOR CONSTRUCTOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator (Constructor) - First Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $26.94 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $28.41 Elevator (Constructor) - Second Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $27.35 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $28.84 Elevator (Constructor) - Third Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $28.17 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $29.69 Elevator (Constructor) - Fourth Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $29.00 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $30.54 (Local #1) ELEVATOR REPAIR & MAINTENANCE‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator Service/Modernization Mechanic (First Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $26.87 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $28.34 Elevator Service/Modernization Mechanic (Second Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $27.27 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $28.76 Elevator Service/Modernization Mechanic (Third Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $28.08 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $29.60 Elevator Service/Modernization Mechanic (Fourth Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $28.89 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $30.43 (Local #1) ENGINEER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.68 Supplemental Benefit Rate per Hour: $22.55 Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.60 Supplemental Benefit Rate per Hour: $22.55 Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.56 Supplemental Benefit Rate per Hour: $22.55 Engineer - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $35.52 Supplemental Benefit Rate per Hour: $22.55 (Local #15) ENGINEER - OPERATING‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Operating Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour 40% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 (Local #14) FLOOR COVERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Floor Coverer (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 (Carpenters District Council) XXXXXXX‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $13.64 Effective 11/1/2015 - Supplemental Rate Per Hour: $13.79 Xxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $22.97 Effective 11/1/2015 - Supplemental Rate Per Hour: $23.13 Xxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $25.87 Effective 11/1/2015 - Supplemental Rate Per Hour: $26.03 Xxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.04 Effective 11/1/2015 - Supplemental Rate Per Hour: $31.29 (Local #1281) HEAT & FROST INSULATOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Heat & Frost Insulator (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Heat & Frost Insulator (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Heat & Frost Insulator (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 70% of Journeyperson's rate Heat & Frost Insulator (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #12) HOUSE WRECKER‌ (TOTAL DEMOLITION) (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) House Wrecker - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.17 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.32 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.97 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.53 Supplemental Benefit Rate per Hour: $17.33 (Xxxxx Tenders District Council) IRON WORKER - ORNAMENTAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Iron Worker (Ornamental) - 1st Ten Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.50 Iron Worker (Ornamental) - 11 -16 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $37.62 Iron Worker (Ornamental) - 17 - 22 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $38.73 Iron Worker (Ornamental) - 23 - 28 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 70% of Journeyperson's rate Supplemental Rate Per Hour: $40.97 Iron Worker (Ornamental) - 29 - 36 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $43.20 (Local #580) IRON WORKER - STRUCTURAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 6) Iron Worker (Structural) - 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $25.48 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 7- 18 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.08 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 19 - 36 months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.68 Supplemental Benefit Rate per Hour: $46.83 (Local #40 and #361) LABORER (FOUNDATION, CONCRETE, EXCAVATING, STREET PIPE LAYER & COMMON)‌ (Ratio Apprentice to Journeyperson: 1 to 1, 1 to 3) Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - First 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Second 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Third 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Fourth 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 90% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 (Local #731) MARBLE MECHANICS‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Cutters & Setters - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Cutters & Setters - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 55% of Journeyperson's rate Cutters & Setters - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 65% of Journeyperson's rate Cutters & Setters - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Cutters & Setters - Fifth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 85% of Journeyperson's rate Cutters & Setters - Sixth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 95% of Journeyperson's rate Polishers & Finishers - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Polishers & Finishers - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Polishers & Finishers - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Polishers & Finishers - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 90% of Journeyperson's rate (Local #7) XXXXX TENDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxx Xxxxxx - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.39 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.54 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $24.29 Supplemental Benefit Rate per Hour: $18.49 Xxxxx Xxxxxx - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.95 Supplemental Benefit Rate per Hour: $18.49 (Local #79) METALLIC LATHER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Metallic Lather (First Year -Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.41 Supplemental Benefit Rate per Hour: $22.89 Metallic Lather (Second Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $34.01 Supplemental Benefit Rate per Hour: $24.54 Metallic Lather (Third Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $39.07 Supplemental Benefit Rate per Hour: $25.69 Metallic Lather (First Year -Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.01 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Second Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.11 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Third Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $33.21 Supplemental Benefit Rate per Hour: $17.95 (Local #46) MILLWRIGHT‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Xxxxxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.23 Supplemental Benefit Rate per Hour: $34.06 Xxxxxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.18 Supplemental Benefit Rate per Hour: $37.62 Xxxxxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $37.13 Supplemental Benefit Rate per Hour: $41.83 Xxxxxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $47.03 Supplemental Benefit Rate per Hour: $48.31 (Local #740) PAVER AND ROADBUILDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Paver and Roadbuilder - First Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.05 Supplemental Benefit Rate per Hour: $17.12 Paver and Roadbuilder - Second Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.69 Supplemental Benefit Rate per Hour: $17.12 (Local #1010) PAINTER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painter - Brush & Roller - First Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $15.80 Supplemental Benefit Rate per Hour: $11.88 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $16.40 Supplemental Benefit Rate per Hour: $12.13 Painter - Brush & Roller - Second Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $19.75 Supplemental Benefit Rate per Hour: $15.73 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $20.50 Supplemental Benefit Rate per Hour: $15.98 Painter - Brush & Roller - Third Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $23.70 Supplemental Benefit Rate per Hour: $18.64 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $24.60 Supplemental Benefit Rate per Hour: $18.89 Painter - Brush & Roller - Fourth Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $31.60 Supplemental Benefit Rate per Hour: $24.02 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $32.80 Supplemental Benefit Rate per Hour: $24.27 (District Council of Painters) PAINTER - STRUCTURAL STEEL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painters - Structural Steel (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Painters - Structural Steel (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Painters - Structural Steel (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #806) PLASTERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Plasterer - First Year: 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $15.76

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • General Project Description 2. Substation location.

  • Sale Area Map The boundaries of “Sale Area” and any subdivision thereof, are as shown on the at- tached “Sale Area Map” that is made a part hereof, and were, before timber sale advertisement, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of Sale Area and its approximate acreage are stated in A1. Subdivisions may be revised and additional ones may be established only by written agreement. Subdivisions or cutting units may be eliminated from Sale Area under conditions described in B6.36. Catastrophically Damaged areas may be re- moved from Sale Area under B8.32. Where applicable, the following are also identified on Sale Area Map:

Time is Money Join Law Insider Premium to draft better contracts faster.