Common use of Alternatives Development Clause in Contracts

Alternatives Development. In order to develop a consensus on the baseline project, two alternatives will be developed to approximately a 10% design level and studied. Plans will include a bridge general plan and a roadway plan and profile sheet. Up to three replacement alternatives will be developed. These may include: • Replace with a 6-lane bridge with 8’ shoulders and 5’ sidewalks, Width = 118’. Demo the existing bridge and re- align traffic to new structure (off-alignment). • Replace with a 4-lane bridge with 8’ shoulders, 4’ striped median and 5’ sidewalks, Width =.82’ Demo the existing bridge and re-align traffic to new structure (off-alignment). Construction within existing right-of-way.

Appears in 3 contracts

Sources: Agreement for Preliminary Engineering, Environmental Documentation and Final Design, Consulting Agreement, Agreement to Provide Preliminary Engineering, Environmental Documentation and Final Design