ADDITIONAL STORMWATER-DESIGN. The design of the stormwater-management facilities was more extensive than originally estimated because eliminating the MSE berm resulted in significant changes to grading, civil design development, and stormwater modeling. We were required to perform new stormwater modeling to complete the stormwater design and permitting (see Section 1.1.3). The additional effort also includes submitting a permit determination request to FDEP and we will address FDEP permitting requirements as necessary to complete the stormwater development task and provide a functioning stormwater-management system. Because of the design changes, Xxxxx Xxxxxxx will modify the design and prepare signed-and-sealed permitting and construction documents.
AutoNDA by SimpleDocs

Related to ADDITIONAL STORMWATER-DESIGN

  • Timber Designations Timber designated for cutting shall be confined to Sale Area, except as provided in B2.131, B2.14, B2.15, B2.32, and B5.1. Sale Area Map indicates subdivisions, if any, where Marking under B2.35 is to be done after timber sale advertisement, except for construction clearing under B2.32, minor changes under B2.37, and damaged timber. The boundaries of Clearcutting Units, Overstory Re- moval Units, and Understory Removal Units were plainly Marked on ground before timber sale advertisement and are shown on Sale Area Map. Boundary trees shall not be cut. The number of units and approximate acreage of timber designations are stated in A3.

  • Information Systems Acquisition Development and Maintenance Security of System Files. To protect City Information Processing Systems and system files containing information, Service Provider will ensure that access to source code is restricted to authorized users whose specific job function necessitates such access.

  • No Process or Design Changes Supplier shall not make any process or design changes affecting Products or Services without DXC’s prior written consent.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Master Feeder Structure If permitted by the 1940 Act, the Board of Trustees, by vote of a majority of the Trustees, and without a Shareholder vote, may cause the Trust or any one or more Series to convert to a master feeder structure (a structure in which a feeder fund invests all of its assets in a master fund, rather than making investments in securities directly) and thereby cause existing Series of the Trust to either become feeders in a master fund, or to become master funds in which other funds are feeders.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.