ACCEPTANCE COMMENTS Clause Samples
ACCEPTANCE COMMENTS. REFLEX(TM)III SPECIFICATIONS & ACCEPTANCE REPORT, MARCH 1999. VERSION NO. 9.03., PAGE 7 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE. CHECK APPROPRIATE BOX: The / / installation(/ / final test) is satisfactorily completed and the / / warranty period (/ / customer shipment) will commence. Date: -------------------- ----------------------------- ---------------------------------- Customer (Manager) Signature Bruker Service Engineer Signature REFLEX(TM)III SPECIFICATIONS & ACCEPTANCE REPORT, MARCH 1999. VERSION NO. 9.03., PAGE 8 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE. [GRAPHIC - DESCRIPTION TO COME] PURPOSE OF INSTALLATION: To ensure that instruments and systems are correctly installed and functioning as designed in the customer's facility. Correct installation is the first step in ensuring that instruments and systems operate reliably over an extended lifetime. CUSTOMER RESPONSIBILITIES: The customer should ensure that the installation site is prepared in accordance with the specifications contained in the relevant site preparation document and that the necessary operating supplies, consumable and usage dependent items such as gases, vials, syringes and solvents are available. A customer representative should be present at all times during the installation. INSTALLATION CHECKLIST: DAY 1 SHIPMENT VERIFICATION / / Unpack and verify condition, as well as completeness, of shipment. - If shipment is damaged or incomplete, please notify:
1. Gerd Huelso Bruker Product Support Tel. (49) 421/▇▇▇▇ ▇▇▇ Fax (49) 421/▇▇▇▇ ▇▇▇ Date: ---------------- name: ----------------
2. Carrier notified: date: ---------------- name: ----------------
3. Record damaged or missing material: ----------------------------------- ----------------------------------- ----------------------------------- PRE-INSTALLATION CHECK / / Verify that the site preparation kit has been correctly and fully installed. - Main power for mass spectrometer
1. Check power cord for specified power and proper connection.
2. Check for available outlet for syringe pump. Verify that the power and power outlet match that of the pump and included power cord.
3. Check for available outlets for the computer, monitor and printer. Verify that the power outlets match that of the included power cords.
4. Check for available outlets for the HPLC system if ordered from Bruker. Verify that the power outlets match that of those included with the HPLC. - Check that the gas supply lines for the instrument have been pr...
