2x Drivers Sample Clauses

2x Drivers. The Contractor shall only employ personnel with the adequate certification and competence to fulfil their roles and responsibilities. The Contractor will over the term be asked to provide scaffolds other than light duty/General purpose scaffolds, such as Heavy duty, Load Bearing, Cantilever, Suspended, Protection Scaffolds etc. These scaffolds will require to be designed to meet with the current legislation. The Contractor is required to provide the materials/equipment and services to the IO for a duration of two years with the option of extending the term for a further two years every two years, for a maximum term with extensions of 8 years. Expectations for fluctuations to both the labour and materials/plant should be taken into account as per the needs of the project. It is an expectation from IO that the Contractor is to remain flexible and supply a Safe service at all times that does not affect productivity on the project. All scaffolding is to be erected, dismantled and modified in compliance with French recognised standards Article R4323-69. The Contractor will be required to use the Scafftag system (tagging system for clear visibility of equipment status for safety) which will require the Contractor to inspect the scaffold on completion and before first use tag as fit for purpose followed by a periodic inspection every 7 days and after any severe adverse weather conditions and any modifications. The Scafftag holder and insert will be situated at every access point of the scaffold. All the aforementioned to be recorded in a site register and to be electronically sent to the CMA Scaffold Manager on a weekly basis. The Contractor will be responsible for delivery of materials to site, ensuring sufficient components and labour resource is available to service the project, maintaining the materials in good condition ensuring all components are free from any damage, crack, splits, corrosion or other defects. Damaged components should immediately be quarantined or removed from site and replaced. The Contractor’s Health and Safety personnel shall carry out periodic inspections and audits of scaffolds to ensure they are fit for purpose. The Contractor shall ensure the Personnel Protective Equipment and safety equipment for his staff such as safety harnesses and fall arrestors are worn correctly and maintained to a high standard and recorded. All works shall be carried out in a safe manner without undue risk complying with the Permit to Work system. Methods s...