▇▇▇ ▇▇▇▇ and Webuild CEO ▇▇▇▇▇▇ Clause Samples

▇▇▇ ▇▇▇▇ and Webuild CEO ▇▇▇▇▇▇. ▇▇▇▇▇▇ Webuild is a global leader in the design and construction of large, complex projects in the sectors of sustainable mobility (rail, metro, bridges, roads, ports), hydropower (dams, power plants), water (treatment and desalination plants, wastewater management, irrigation dams) and green buildings (civil and industrial buildings, airports, stadiums, hospitals). It supports clients in achieving the Sustainable Development Goals (SDGs) established by the United Nations. The recognised leader in infrastructure for the water sector, it operates in 50 countries, generating 70 percent of its revenues from international markets. It has 83,000 direct and indirect employees from 100 nationalities, and a supply chain of more than 17,500 businesses. In its 117 years of applied engineering on more than 3,200 projects, the Group has built 14,118 kilometres of rail and metro lines, 82,509 kilometres of roads and highways, 1,018 kilometres of bridges and viaducts, 3,396 kilometres of tunnels, and 313 dams and hydropower plants. Projects include the Genoa San Giorgio Bridge, the second Panama Canal, the Lake ▇▇▇▇ Third Intake hydraulic project near Las Vegas in the United States, the Airport Line in Perth, Australia and the ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Foundation Cultural Center in Athens. Projects under construction include the ▇▇▇▇▇▇▇ Base Tunnel, Line 4 of the Milan metro system, the Terzo Valico dei Giovi-Nodo ▇▇ ▇▇▇▇▇▇ in Italy, and the North East Link of Melbourne in Australia. . In 2022, the Group had revenues of €8.2 billion, total orders worth more than €53 billion, and projects that will help reduce annual CO2 emissions by 25 million tonnes. Webuild, subject to the direction and coordination of Salini Costruttori S.p.A., is headquartered in Italy and is listed on the Milan stock exchange (WBD; WBD.MI; WBD:IM). Since 2021, it is member of the MIB ESG, the index of Italian companies with the best ESG practices.

Related to ▇▇▇ ▇▇▇▇ and Webuild CEO ▇▇▇▇▇▇

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.