Sewerage Sample Clauses

Sewerage. The Company must progressively provide sewerage facilities within the Development Area and connection to temporary treatment facilities as may be required by the Water Authority of Western Australia. Such temporary treatment facilities will be operated by the Water Authority of Western Australia. The Company must provide, or pay the Water Authority of Western Australia for the provision of (at the Water Authority of Western Australia’s option) all reticulation sewers. Other facilities must be provided in accordance with the Water Authority of Western Australia’s policy and standards.
AutoNDA by SimpleDocs
Sewerage. The entire sewage of the Project will be treated by the modern sewage treatment technology. This will efficiently treat the sewage and provide clean treated water at the end, which may be used for horticulture purposes. All the Units in the Project are to be connected to this system. For greater efficiencies and environmental reasons, the Allottee shall not dispose of solid wastes like paper and kitchen waste into the waste drains of toilets and kitchens.
Sewerage. Ensure that the Annual Budget makes adequate provision for maintenance, renewal, upgrading and refurbish- ment of existing obsolete networks and equipment Sewerage: Secure a realistic amount on the Annual Budget for maintenance, renewal, upgrading and refurbishment Director Civil Engineering Services Sewerage: % of the depreciated asset value provided on the Annual Budget for maintenance, renewal, upgrading and refurbishment Norm = 7.5%
Sewerage. 5 23-27 Providing, laying, cutting, jointing, testing and disinfecting. pipes of B.S.S. with `D' 2 and valves is not included in the Class working pressure complete in all respects:- a) 2" i/d (50 mm) Rft 110 79.95 b) 3" i/d (75 mm) Rft 990 169.00 c) 4" i/d (110 mm) Rft 330 281.60 Total "A"(Schedule items) NON SCHEDULE ITEMS 1 PH-0018 P/F OF WATER CLOSET ORRISA PATTERN FULL SIZE 3 star Made Nos. 13 2,850 2 PH-0017 P/F OF FLUSHING CISTERN. 3 Star Made Nos. 13 3,300 3 PH-0016 P/F OF WASH H& BASIN WITH PEDESTAL & FITTINGS. 3 Star Made Nos. 4 5,894 4 PH-0019 P/F OF VANITY COUNTER BASIN INCLUDING COST OF FITTINGS. 3 Star Made Nos. 13 4,340 6 PH-0009 P/F OF SINK MIXER (020) 1/2" DIA Master Made Nos. 1 4,500 7 PH-0008 P/F OF BASIN MIXER (801) 1/2" DIA Faisal Made Nos. 17 4,750 8 PH-0011 P/F OF WALL SHOWER (054). Mater Made Nos. 20 9,700 9 PH-0001 P/F OF BIB COCK 1/2" DIA. (005) Master Made Nos. 21 1,145 10 PH-0004 P/F OF TEE STOP COCK (1404) 1/2" DIA. Faisal Made Nos. 55 1,232 12 PH-0022 P/F OF SOAP Dish 2007). Master Made Nos. 37 525 13 PH-0022 Providing and fixing toilet paper holder heavy duty master made with fitting material. Nos. 21 1,200 14 PH-0021 P/F OF TOWEL RAIL WITH BRACKETS CHROMIUM PLATED (5302). Faisal Made Nos. 10 920 16 PH-0115 Making Sewerage Connection To Existing Manhole Of Main Sewerage Pipe Line Including Cost Of Plugging, Dewatering, De-Silting, Making Hole In Wall Repairing And Restoration Etc Complete In Working Condition Job 1 1,200 18 PPR PIPE 19 PH-0025 P/F OF PPRC PIPE 25MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 436 Rft 135 20 PH-0027 P/F OF PPRC PIPE 32MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 334 Rft 145 21 PH-0029 P/F OF PPRC PIPE 40MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 471 Rft 230 23 PH-0033 P/F OF PPRC PIPE 63MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 600 Rft 525 24 NS Valves Providing and installing valves of following nominal dia, P/F OF H&LE VALVE 1". Faisal Made 1 Nos. 900 P/F OF H&LE VALVE 1-1/2" DIA. Faisal Made 1 Nos. 1,700 P/F OF GATE VALVE 2" DIA. Kitz Made 8 Nos. 6,300 25 Vent Cowel P/F OF NIKASI VENT COWL 110MM.DADEX MADE: 4" i.d 15 Nos 190 26 Multifloor Trap P/F OF NIKASI P-TARP 110MM. DADEX MADE 70 Nos. 1,700 27 NS Providing, fixing, jointing and testing Polypropylene Random (PPR) pipes, DADEX or approved equivalent, pressure pipe for cold/hot water as per DIN 8077-8078,PN-20 for pipes and DIN 16962,PN- 25 for fittings ( polyfusion welded joints) inside building including fittings and specials (sockets...
Sewerage. Each property will be provided with one permanent sewer connection point.
Sewerage. The new terminal will be supported by the installation of a packaged sewerage treatment plant sized to support the 2028 loads. The plant shall be modularly expandable to process loads beyond 2028. Communications The existing communications duct bank to the existing terminal will be relocated prior to construction of the new terminal. Electrical The existing electrical duct bank, (which follows a similar alignment to the existing communications duct bank) will be relocated prior to constructions of the new terminal. Storm Water Storage Storm water from the terminal shall be captured and stored in above grade storage tanks located north of the new terminal.
Sewerage. DRAINAGE SECTION
AutoNDA by SimpleDocs
Sewerage. The Company must progressively provide sewerage facilities within the Development Area and connection to temporary treatment facilities as may be required by the Water Authority of page 50 Version 02-a0-04 As at 23 May 2014 Extract from xxx.xxx.xx.xxx.xx, see that website for further information Port Xxxxxxx Development Agreement Act 1992 The Agreement Schedule 1 Western Australia. Such temporary treatment facilities will be operated by the Water Authority of Western Australia. The Company must provide, or pay the Water Authority of Western Australia for the provision of (at the Water Authority of Western Australia’s option) all reticulation sewers. Other facilities must be provided in accordance with the Water Authority of Western Australia’s policy and standards.
Sewerage. The Lessee shall pay to the Port Authority such of the existing and future charges for sewerage services furnished by the City of New York as are presently or may hereafter be imposed or assessed against the Port Authority in respect of the Premises or its use and occupancy thereof. In the event that the City or the State of New York is now furnishing services with or without charge therefor, which are beneficial to the Lessee in its use and occupancy of the Premises, and shall hereafter impose charges or increase existing charges for such services, the Lessee agrees to pay to the Port Authority such of the charges or the increase in charges as may be imposed or assessed against the Port Authority in respect to the Premises or its use and occupancy thereof.
Sewerage. (i) Sewerage subprojects are limited to areas where the per capita water supply levels have been established as per the relevant guidelines of GOI to ensure that self-cleansing velocities can be achieved on a regular basis without frequent system flushing.
Time is Money Join Law Insider Premium to draft better contracts faster.