Sewerage Sample Clauses

Sewerage. The Company must progressively provide sewerage facilities within the Development Area and connection to temporary treatment facilities as may be required by the Water Authority of Western Australia. Such temporary treatment facilities will be operated by the Water Authority of Western Australia. The Company must provide, or pay the Water Authority of Western Australia for the provision of (at the Water Authority of Western Australia’s option) all reticulation sewers. Other facilities must be provided in accordance with the Water Authority of Western Australia’s policy and standards.
Sewerage. The entire sewage of the Project will be treated by the modern sewage treatment technology. This will efficiently treat the sewage and provide clean treated water at the end, which may be used for horticulture purposes. All the Units in the Project are to be connected to this system. For greater efficiencies and environmental reasons, the Allottee shall not dispose of solid wastes like paper and kitchen waste into the waste drains of toilets and kitchens.
Sewerage. Ensure that the Annual Budget makes adequate provision for maintenance, renewal, upgrading and refurbish- ment of existing obsolete networks and equipment Sewerage: Secure a realistic amount on the Annual Budget for maintenance, renewal, upgrading and refurbishment Director Civil Engineering Services Sewerage: % of the depreciated asset value provided on the Annual Budget for maintenance, renewal, upgrading and refurbishment Norm = 7.5%
Sewerage. 4 21-1 Providing and laying RCC pipe, moulded with cement concrete 1:1.5:3, with spigot socket or collar joint, etc. including cost of reinforcemnt, confirming to B.S. 5911: Part I: 1981, class "L" including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing, cutting pipes where necessary, finishing and testing, etc. complete. (i) 150 mm (6:) i/d Rft 145 190.50 (ii) 225 mm (9:) i/d Rft 30 343.20 Total "A"(Schedule items) NON SCHEDULE ITEMS 1 PH-0016 P/F OF WASH H& BASIN WITH PEDESTAL & FITTINGS. 3 Star Made Nos. 2 5,894 2 PH-0019 P/F OF VANITY COUNTER BASIN INCLUDING COST OF FITTINGS. 3 Star Made Nos. 2 4,340 3 PH-0009 P/F OF SINK MIXER (020) 1/2" DIA Master Made Nos. 1 4,500 4 PH-0008 P/F OF BASIN MIXER (801) 1/2" DIA Faisal Made Nos. 4 4,750 6 PH-0001 P/F OF BIB COCK 1/2" DIA. (005) Master Made Nos. 4 1,145 7 PH-0004 P/F OF TEE STOP COCK (1404) 1/2" DIA. Faisal Made Nos. 12 1,232 8 PH-0022 P/F OF SOAP Dish 2007). Master Made Nos. 4 525 9 PH-0022 Providing and fixing toilet paper holder heavy duty master made with fitting material. Nos. 4 1,200 10 PH-0021 P/F OF TOWEL RAIL WITH BRACKETS CHROMIUM PLATED (5302). Faisal Made Nos. 4 920 11 PH-0115 Making Sewerage Connection To Existing Manhole Of Main Sewerage Pipe Line Including Cost Of Plugging, Dewatering, De-Silting, Making Hole In Wall Repairing And Restoration Etc Complete In Working Condition Job 1 1,200 13 PPR PIPE 14 PH-0025 P/F OF PPRC PIPE 25MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 120 Rft 135 15 PH-0027 P/F OF PPRC PIPE 32MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 90 Rft 145 16 PH-0029 P/F OF PPRC PIPE 40MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 70 Rft 230 17 PH-0031 P/F OF PPRC PIPE 50MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 85 Rft 340 18 PH-0033 P/F OF PPRC PIPE 63MM DIA COMPLETE WITH ALL RESPECT. Dadex Made 135 Rft 525 19 Valves Providing and installing valves of following nominal dia, PH-0111 P/F OF H&LE VALVE 1". Faisal Made 1 Nos. 900 PH-0112 P/F OF H&LE VALVE 1-1/2" DIA.Faisal Made 1 Nos. 1,700 PH-0113 P/F OF GATE VALVE 2" DIA. Kitz Made 2 Nos. 6,300 20 Vent Cowel PH-0095 P/F OF NIKASI VENT COWL 110MM.DADEX MADE: 4" i.d 3 Nos 190 21 Multifloor Trap PH-0020 P/F OF NIKASI P-TARP 110MM. DADEX MADE 10 Nos. 1,700 22 NS Glass Providing and fixing best quality distortion free imported Belgium glass (beveled) mirrors 5mm thick, with hard board backing, chromium plated screws/brackets, complete in all respects as per specificatio...
Sewerage. Each property will be provided with one permanent sewer connection point.
Sewerage. The new terminal will be supported by the installation of a packaged sewerage treatment plant sized to support the 2028 loads. The plant shall be modularly expandable to process loads beyond 2028. Communications The existing communications duct bank to the existing terminal will be relocated prior to construction of the new terminal. Electrical The existing electrical duct bank, (which follows a similar alignment to the existing communications duct bank) will be relocated prior to constructions of the new terminal. Storm Water Storage Storm water from the terminal shall be captured and stored in above grade storage tanks located north of the new terminal.
Sewerage. DRAINAGE SECTION
Sewerage. The Lessee shall pay to the Port Authority such of the existing and future charges for sewerage services furnished by New York City as are presently or may hereafter be imposed or assessed against the Port Authority in respect of the Premises or its use and occupancy thereof. In the event that New York City or the State of New York is now furnishing services with or without charge therefor, which are beneficial to the Lessee in its use of the Premises, and shall hereafter impose charges or increase existing charges for such services, the Lessee agrees to pay to the Port Authority such of the charges or the increase in charges as may be imposed or assessed against the Port Authority in respect of the Premises or its use and occupancy thereof.
Sewerage. Sewerage service as furnished by the City of New Y ark. The Sublessee shall pay Sublessor promptly its Pro Rata Share of charges imposed or assessed against the Port Authority and charged to the Sublessor with respect to the use and occupancy of the Leased Premises of which the Subleased Premises form a part.
Sewerage. The component includes (i) design, supply, construction, testing and commissioning of sewage treatment plant at Dehradun including operation and maintenance for a period of five years following commissioning; (ii) Supply, laying, testing and commissioning of sewer network in unsewered area of Kargi zone of Dehradun including construction of manhole and inspection xxxxxxxx; and (iii) design, supply, construction, testing and commissioning of sewage pumping stations and rising mains, if necessary, in Dehradun, including operation and maintenance for a period of five years following commissioning. Part B: Capacity Development and Investment Program Management