SEDIMENT CONTROL STRUCTURES Sample Clauses

SEDIMENT CONTROL STRUCTURES. Sediment control shall be accomplished using sediment traps, silt fences, settling ponds, slash windrows, or other methods as approved in writing by the Contract Administrator.
AutoNDA by SimpleDocs
SEDIMENT CONTROL STRUCTURES. On the following road, Purchaser shall install sediment traps in accordance with the SEDIMENT TRAP DETAIL. Road Stations Comments D‐2035 Xxx Xxxx 0+00 Xxxxxxxxx sediment traps on either side of culvert inlet 8‐2 PROTECTION FOR EXPOSED SOIL Purchaser shall provide and evenly spread a 4‐inch layer of straw to all exposed soils. Soils must be covered before the first anticipated storm event. Soils may not sit exposed during any rain event.
SEDIMENT CONTROL STRUCTURES. On the following roads, Purchaser shall install sediment trap in accordance with the SEDIMENT TRAP DETAIL. Sediment control shall be accomplished using sediment traps or other methods as approved in writing by the Contract Administrator. Road Stations H‐9600 26+10 8‐2 PROTECTION FOR EXPOSED SOIL Purchaser shall provide and evenly spread a 3‐inch layer of straw to all exposed soils within 50 feet of a stream or wetland. Soils must be covered before the first anticipated storm event. Soils may not sit exposed during any rain event.
SEDIMENT CONTROL STRUCTURES. On the following road, Purchaser shall install a sediment pond in accordance with the SETTLING POND DETAIL. Road Stations Comments D‐5000 67+20, 72+60, 73+40 On right.
SEDIMENT CONTROL STRUCTURES. On the following road(s), Sediment control shall be as listed below or other methods as approved in writing by the Contract Administrator. Road Stations Left and/or Right Comments PA-J-1200 30+85 Left and Right Silt Fence in Ditch x 3 8-2 PROTECTION FOR EXPOSED SOIL Purchaser shall provide and evenly spread a 3-inch layer of straw or hay to all exposed soils at bridge installation and at culvert installations within 100 feet of a stream or wetland. Soils must be covered before the first anticipated storm event. Soils may not sit exposed during any rain event. DRAFT SUBSECTION REVEGETATION 8-15 REVEGETATION Purchaser shall spread grass seed and straw and/or hay mulch on all exposed soils including, but not limited to, stream culverts, waste areas, sidecast pullback areas, stream crossing removals, bridge installations, and other areas directed by the Contract Administrator. Revegetation of exposed soils shall be accomplished by manual dispersal of grass seed unless otherwise detailed in this Road Plan. Other methods of covering must be approved in writing by the Contract Administrator.
SEDIMENT CONTROL STRUCTURES. On the following road, Purchaser shall install a sediment pond in accordance with the SETTLING POND DETAIL. Sediment control shall be accomplished using sediment traps, silt fences, settling ponds, or other methods as approved in writing by the Xxxxxxxx Xxxxxxxxxxxxx. Xxxx Xxxxxxxx XX-0000 41+90, 42+10, 47+10, 47+30, 90+40 8-2 PROTECTION FOR EXPOSED SOIL Purchaser shall provide and evenly spread a 4-inch layer of straw to all exposed soils within 50 feet of a stream or wetland. Soils must be covered before the first anticipated storm event. Soils may not sit exposed during any rain event.
SEDIMENT CONTROL STRUCTURES. 9.1 Contractor shall construct and maintain necessary settlement control structures for runoff as required by mining permits, NPDES permits, and any other applicable permits.
AutoNDA by SimpleDocs
SEDIMENT CONTROL STRUCTURES. On the following road(s), Purchaser shall install sediment traps in accordance with the SEDIMENT TRAP DETAIL. Road Stations Comments R‐130 37+84 Install two sediment traps on woodside of culvert.
SEDIMENT CONTROL STRUCTURES. On the following roads, Purchaser shall install sediment traps, and/or geotextile silt fencing in accordance with the manufacturer’s instructions. Road Stations Comments FG‐ML 0+00 to 63+29  Install silt fencing at typed water crossings as directed by the contract administrator. There are 3 typed water crossings.  Install sediment traps at typed water crossings as directed by the contract administrator. FG‐06 0+00 to 60+92  Install silt fencing at typed water crossings as directed by the contract administrator. There are 4 typed water crossings.  Install sediment traps in ditches adjacent to typed water crossings as directed by the contract administrator. FG‐0606 0+00 to 4+93  Install silt fencing at typed water crossings as directed by the contract administrator. There is 1 typed water crossings. FG‐0608 0+00 to 10+18  Install silt fencing at typed water crossings as directed by the contract administrator. There is 1 typed water crossings. BW‐13 22+00 to 24+81  Install silt fencing on right side of road to separate road from typed water.

Related to SEDIMENT CONTROL STRUCTURES

  • Master Feeder Structure If permitted by the 1940 Act, the Board of Trustees, by vote of a majority of the Trustees, and without a Shareholder vote, may cause the Trust or any one or more Series to convert to a master feeder structure (a structure in which a feeder fund invests all of its assets in a master fund, rather than making investments in securities directly) and thereby cause existing Series of the Trust to either become feeders in a master fund, or to become master funds in which other funds are feeders.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Agreement Structure 2.1 An “Agreement” hereunder shall consist of this Master Agreement, the Schedule, and their applicable attachments and represents the complete and exclusive agreement between the Parties regarding the subject matter of the Schedule, and replaces any prior oral or written communications between the Parties relating thereto. Each Lease is effective when the Schedule containing such Lease is executed by the Parties thereto.

  • Exception Where Databases Contain Sufficient Information A Reporting Financial Institution is not required to perform the paper record search described in subparagraph D.2. of this section if the Reporting Financial Institution’s electronically searchable information includes the following:

  • Management Structure Describe the overall management approach toward planning and implementing the contract. Include an organization chart for the management of the contract, if awarded. 3.2

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Grading systems of the institutions [It is recommended that receiving institutions provide the statistical distribution of grades according to the descriptions in the ECTS users’ guide7. A link to a webpage can be enough. The table will facilitate the interpretation of each grade awarded to students and will facilitate the credit transfer by the sending institution.]

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

Time is Money Join Law Insider Premium to draft better contracts faster.