The REQUIRED ROADS clause sets out the obligations regarding the construction, maintenance, or provision of specific roads necessary for a project or development. Typically, it details which party is responsible for building or upgrading access roads, the standards these roads must meet, and the timeline for their completion. This clause ensures that essential transportation infrastructure is in place to support the intended use of the property or project, thereby preventing delays and clarifying responsibilities related to access.
REQUIRED ROADS. The specified work on the following roads is required.
REQUIRED ROADS. The specified work on the following roads is required. P-2100 0+00 – 35+20 Pre-Haul Maintenance P-2100.1 0+00 – 1+00 Pre-Haul Maintenance
REQUIRED ROADS. The specified work on the following roads is required. K5000 0+00 to 42+37 Pre-haul Maintenance K5000 94+70 to 106+10 Pre-haul Maintenance K5030 0+00 to 20+70 Pre-haul Maintenance K5031 0+00 to 11+40 Pre-haul Maintenance K5112 0+00 to 12+30 Pre-haul Maintenance K5200 0+00 to 21+50 Pre-haul Maintenance
REQUIRED ROADS. The specified work on the following roads is required. R‐100 0+00 to 128+08 Pre‐haul Maintenance R‐120 0+00 to 23+50 Pre‐haul Maintenance R‐120 23+50 to 29+17 Reconstruction R‐120C 0+00 to 3+44 Pre‐haul Maintenance R‐130 0+00 to 35+90 Reconstruction 35+90 to 42+05 Construction R‐158 0+00 to 19+42 Pre‐haul Maintenance R‐158A 0+00 to 1+02 Construction
REQUIRED ROADS. The specified work on the following roads is required. The specified work on the following roads is not required. Any optional roads built by the Purchaser must meet all the specifications in the road plan.
REQUIRED ROADS. The specified work on the following roads is required. *If used and/or constructed The specified work on the following roads is not required. Any optional roads built by the Purchaser must meet all the specifications in the road plan. 5715-1 0+00 to 2+30 Pre/Post-haul Maintenance 5715-2 0+00 to 6+40 Reconstruction Construction includes, but is not limited to: • Clearing; • Grubbing; • Right-of-way debris disposal; • Excavation and/or embankment to subgrade; • Turnaround and turnout construction; • Landing construction; • Acquisition and installation of drainage structures; • Acquisition, manufacture, and application of rock. Reconstruction includes, but is not limited to: • Clearing • Grubbing. • Right-of-way debris disposal. • Excavation and/or embankment to subgrade. • Ditch construction. • Turnaround construction. • Acquisition, manufacture, and application of rock. • Acquisition and installation of drainage structures. • Roadside brushing.
REQUIRED ROADS. The specified work on the following roads is required. PA-J-1000 0+00 – 102+50 Prehaul Maintenance PA-J-1025 0+00 – 31+15 Reconstruction PA-J-1025.1 0+00 – 6+85 Construction PA-J-1100 0+00 – 1+25 Prehaul Maintenance PA-J-1200 0+00 – 65+00 Prehaul Maintenance PA-J-1200 65+00 – 77+85 Reconstruction PA-I-3000 0+00 – 110+30 Prehaul Maintenance PA-I-3040 0+00 – 11+80 Prehaul Maintenance DRAFT
REQUIRED ROADS. The specified work on the following roads is required. The specified work on the following roads is not required. Any optional roads built by the Purchaser must meet all the specifications in the road plan. Construction includes, but is not limited to the following: clearing and grubbing; waste and debris disposal; excavation and embankment to sub-grade; full-bench excavation and end haul material; acquisition and installation of drainage structures; shaping and compaction of subgrade; switchback construction; turnout, turnaround, and landing construction; manufacture, application and compaction of rock; acquisition and application of erosion control materials.
REQUIRED ROADS. The specified work on the following roads is required. USFS 3100 0+00 to 282+30 Pre-haul Maintenance M3080 30+35 to 32+60 Pre-haul Maintenance 47+45 to 49+20 Pre-haul Maintenance M3090 0+00 to 12+30 Pre-haul Maintenance M3980 50+50 to 53+15 Pre-haul Maintenance
REQUIRED ROADS. The specified work on the following roads is required. D-Line 0+00 to 43+05 Prehaul Maintenance E-Line 0+00 to 266+04 Prehaul Maintenance E-2010 0+00 to 18+89 Prehaul Maintenance E-2020 0+00 to 3+50 Prehaul Maintenance E-3000 0+00 to 208+65 Prehaul Maintenance E-3020 0+00 to 4+00 Prehaul Maintenance E-3030 0+00 to 42+69 Prehaul Maintenance E-3030 42+69 to 67+65 Reconstruction E-3039A 0+00 to 4+23 Abandonment (If Built) E-3400 0+00 to 49+91 Prehaul Maintenance E-3400A 0+00 to 2+72 Prehaul Maintenance E-3500 0+00 to 43+06 Prehaul Maintenance E-3580 0+00 to 21+58 Prehaul Maintenance