Pricing Instructions Sample Clauses

Pricing Instructions. 1 The Bills of Quantities have been drawn up in accordance with the Standard System of Measuring Building Work (as amended) published and issued by the Association of South African Quantity Surveyors (Sixth Edition (Revised)), 1999. Where applicable the:
AutoNDA by SimpleDocs
Pricing Instructions. The intended pricing strategy to be followed in this tender is according to the Price List (including the activity schedule).
Pricing Instructions. A. This is a firm fixed-price Contract for subsidized Payment of these Services.
Pricing Instructions. A. The Department anticipates award of firm fixed-price Contracts for subsidized Payment of these Services.
Pricing Instructions. Option A
Pricing Instructions. The bidder shall list the initial setup costs (if any) and the monthly price for each facility, building, streets, medians, and assigned areas. The total combined annual costs shall be included as the final figure. A bid form is included listing each area of maintenance individually by price and an opportunity to provide a total annual price.
Pricing Instructions. 1 For the purposes of this bill of quantities, the following words shall have the meanings hereby assigned to them: Unit: The unit of measurement for each item of work as defined in the standard specifications or the project specifications.
AutoNDA by SimpleDocs
Pricing Instructions. The service provider should prepare and submit a priced schedule of quantities based on the preliminary design drawings for the entire scope of works with sufficient details to enable evaluation. This priced schedule of quantities should provide a breakdown of the construction cost, broken into individual items with unit rates and quantities. The following costs should be reflected as a minimum in the SoQ:  Preliminary Design cost  Detailed design and production of drawings cost  Aerial Survey cost  Geotechnical Investigation costsEnvironmental Impact Assessment (EIA)  Temporary Works (accommodation of traffic etc)  Compensation for landowners and registration of servitudes  Construction cost of the electricity infrastructure networks (broken into items) etc - to include supply and delivery of all materials and equipment required, construction, installation, testing and commissioning of the works.  Supply and installation of toilet structures  Testing and commissioning of the electricity infrastructure network.  Operation and Maintenance manuals, completion and commissioning reports and As- built drawings.  Compilation of an infrastructure asset register to GRAP17(Up to level 6) for the electricity infrastructure networks  Training of municipal operation and maintenance staff The priced Bill of quantities should be related to the Programme of Works as submitted by the service provider and should address all the items and activities as detailed in this document to cover the full scope of works. The tendered sum for planning, design, survey, environmental impact assessment, geotechnical investigations and training cost should not exceed 14% of the total tendered sum. XX XXXXXX XX XXXXX SEME LOCAL MUNICIPALITY DEPARTMENT NAME: TECHNICAL AND ENGINEERING SERVICES CONTRACT NO: T18/2018 FOR: EPC TURNKEY CONTRACT FOR DESIGN, SUPPLY, CONSTRUCT, TESTING AND COMMISSIONING OF THE ELECTRIFICATION OF 345 HOUSEHOLDS IN VUKUZAKHE XXXX 1 AND 3 (PHASE 4)
Pricing Instructions. 1. Measurement and payment clauses of the SANS 1200 Standardised Specifications, as well as the Particular Specifications, shall be deemed to form part of and included in the pricing instructions.