Mechanical Drawings Sample Clauses

Mechanical Drawings. .1 Provide double line duct work layout and HVAC equipment layout drawings with related diagrams and schematic diagrams, schedules, notes, detailing and section drawings completed sufficiently to communicate the design intent and coordination with other disciplines.
AutoNDA by SimpleDocs
Mechanical Drawings. 1) Plumbing and mechanical cover sheets with fixture schedule, legend, abbreviations, and standard details.
Mechanical Drawings. Submit the percent completion for all mechanical drawings including electrical, plumbing, heating, air conditioning, sanitary and equipment.
Mechanical Drawings. A sufficient level of detail shall be pro­vided to illustrate connections, routings, and other items in complex areas.
Mechanical Drawings. (1) Plans showing single line layouts with approximate sizing of major xxxx and piping systems on architectural plan backgrounds.
Mechanical Drawings. Scale at least Redlined architectural drawings are acceptable if accurate. Floor and reflected ceiling plans to show any major ductwork. 0355
Mechanical Drawings. Update previous drawings and include the following::
AutoNDA by SimpleDocs
Mechanical Drawings. To include load calculations submitted on the forms contained in the Airports Authority Design and Technical Criteria Package and proposed locations of large size Contractor equipment.
Mechanical Drawings. HVAC Distribution Plan, at 1/4” = 1’- 0” scale Controls Plan Reflected Ceiling Plan, at 1/4” = 1’- 0” scale Mechanical/Electrical Schedule Plumbing Plan, at 1/4” = 1’- 0” scale Plumbing Fixture Units Schedule Specifications Plumbing and Mechanical plans must be stamped by a professional engineer currently licensed in the State of Washington. Complete Mechanical/Electrical Schedule and Plumbing Fixture Units Schedule, located in this manual. Electrical Drawings: Floor Plan showing light fixtures, switches, receptacles and equipment Branch circuit wiring and circuiting Riser diagram and load summary Panel Schedules Specifications Light Fixture Schedule Fire Alarm Plan Fire Sprinkler Layout/Plan Calculations showing compliance with the Washington State Energy Code Permits Tenant shall provide all required permits, plan check fees, and all other required government approvals. It is the Tenant’s responsibility to contact the local governing agencies to obtain current permit requirements. Below is a list of contact information for local agencies having jurisdiction over the property: Building Department City of Bellevue - Design and Development X.X. Xxx 00000 Xxxxxxxx, Xxxxxxxxxx 00000 (000) 000-0000 Fire Department Bellevue Fire Prevention Bureau 000 Xxxxxxxx Xxx X.X. Xxxxxxxx, Xxxxxxxxxx 00000 (000) 000-0000 After the construction documents have been approved and signed by both parties, any revisions or changes will require Landlord’s approval. Tenant shall be responsible for all costs associated with said changes. Tenant Design & Construction Manual 2014 23 MECHANICAL/ELECTRICAL SCHEDULE Submit only one completed form. Prepared by: Mechanical Phone Date Electrical Phone Date
Mechanical Drawings. ▪ Provide double line ductwork layout and HVAC equipment layout drawings with related diagrams and schematic diagrams, schedules, notes, detailing and section drawings completed sufficiently to communicate the design intent and coordination with other disciplines. ▪ Provide plumbing equipment, and fixture drawings with related diagrams, schedules, notes, detailing and section drawings completed sufficiently to communicate the design intent and coordination with other disciplines. ▪ Provide dimensioned 1/2 inch scale plans, elevations and sections of the mechanical rooms showing service, clearance, room openings, nominal equipment size, ceiling height, duct clearance between bottom of joist and top of ceiling and any ceiling mounted lighting fixtures, electrical equipment or other building assembly or component, etc.