MATERIAL REQUIREMENTS Sample Clauses

MATERIAL REQUIREMENTS. As provided by FAR 52.211-5 Material Requirements, unless this Agreement specifically requires virgin material or supplies composed of or manufactured from virgin material, Seller shall provide supplies that are composed of unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by- products generated from, and reused within, an original manufacturing process. Used, reconditioned, or remanufactured supplies, or unused Government surplus property shall not be provided unless the Company has authorized their use.
AutoNDA by SimpleDocs
MATERIAL REQUIREMENTS. Use a Department approved pre-packaged, non-shrink, non-metallic grout. Contact the Materials and Tests Unit for a list of approved pre-packaged grouts and consult the manufacturer to determine if the pre-packaged grout selected is suitable for the required application. When using an approved pre-packaged grout, a grout mix design submittal is not required. The grout shall be free of soluble chlorides and contain less than one percent soluble sulfate. Supply water in compliance with Article 1024-4 of the Standard Specifications. Aggregate may be added to the mix only where recommended or permitted by the manufacturer and Engineer. The quantity and gradation of the aggregate shall be in accordance with the manufacturer’s recommendations. Admixtures, if approved by the Department, shall be used in accordance with the manufacturer’s recommendations. The manufacture date shall be clearly stamped on each container. Admixtures with an expired shelf life shall not be used. The Engineer reserves the right to reject material based on unsatisfactory performance. Initial setting time shall not be less than 10 minutes when tested in accordance with ASTM C266. Test the expansion and shrinkage of the grout in accordance with ASTM C1090. The grout shall expand no more than 0.2% and shall exhibit no shrinkage. Furnish a Type 4 material certification showing results of tests conducted to determine the properties listed in the Standard Specifications and to assure the material is non-shrink. Unless required elsewhere in the contract the compressive strength at 3 days shall be at least 5000 psi. Compressive strength in the laboratory shall be determined in accordance with ASTM C109 except the test mix shall contain only water and the dry manufactured material. Compressive strength in the field will be determined by molding and testing 4” x 8” cylinders in accordance with AASHTO T22. Construction loading and traffic loading shall not be allowed until the 3 day compressive strength is achieved. When tested in accordance with ASTM C666, Procedure A, the durability factor of the grout shall not be less than 80.
MATERIAL REQUIREMENTS. 6.1 Subject to the due process procedures set forth in Section 9 of this Agreement, the Company agrees that substantial failure to comply with any material requirement set forth in these customer service standards shall constitute a failure to comply with a material provision of this Agreement.
MATERIAL REQUIREMENTS. (a) Definitions. As used in this clause— “New” means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by- products generated from, and reused within, an original manufacturing process; provided that the supplies meet Agreement requirements, including but not limited to, performance, reliability, and life expectancy.
MATERIAL REQUIREMENTS. (JAN 2003)
MATERIAL REQUIREMENTS. The required material must comply with the following specifications and to be applied as indicated/per application requirements:
MATERIAL REQUIREMENTS. 1. All materials shall conform to the requirements in Table 735.01. Table 735.01
AutoNDA by SimpleDocs
MATERIAL REQUIREMENTS. Applicable Materials Section Aggregates 1033 Air-entraining admixture (wet mix only) 1007 Chemical admixtures (wet mix only) 1007 Curing material 1012 Hydraulic cement 1004 Pozzolans 1008
MATERIAL REQUIREMENTS. 1.2.1 Grade of Felt – 40 % Cotton, 605 Linters in accordance with Grade C of Federal Specification V-M-81 of latest issue.
MATERIAL REQUIREMENTS. Contractor shall be required to furnish all materials, supplies, equipment and/or services necessary to perform Contractual requirements. Materials, supplies and workmanship used in the supplying of the goods for this Contract shall conform to all applicable federal, state, and local codes, regulations and requirements for such equipment, specifications contained herein, and the normal uses for which intended. Materials, supplies and equipment shall be manufactured in accordance with the best commercial practices and standards for this type of materials, supplies, and equipment.
Time is Money Join Law Insider Premium to draft better contracts faster.