Horizontal alignment Sample Clauses

Horizontal alignment. The horizontal alignment of the road should be consistent with the topography of the terrain through which it passes. Minimum curve radii should be applied only when necessary and should be used in conjunction with transition curves. Compound curves should be avoided whenever possible. The minimum radii of horizontal curves are shown in table 5 for each highway class.
AutoNDA by SimpleDocs
Horizontal alignment. In so far as possible, the use of the minimum radius values should be avoided; under normal circumstances it is preferable for the minimum values to be approximately 50 to 100% greater than those indicated. Moreover, transition curves to connect the different radii should be used.
Horizontal alignment. 25 Mainline horizontal alignment must comply with the requirements in Section 203 of the ADOT 00 Xxxxxxx Xxxxxx Xxxxxxxxxx. Xxxxxxx design must not include spiral curves.
Horizontal alignment. ALIGN SPANDREL BEAMS SO THAT THE OFFSET OF ONE END RELATIVE TO THE OTHER FROM THE ALIGNMENT SHOWN ON THE DRAWINGS DOES NOT EXCEED L/500. OFFSETS FOR SPANDREL BEAMS SHALL NOT EXCEED ???. OFFSETS FOR OTHER BEAMS SHALL NOT EXCEED ???. COLUMN ERECTION TOLERANCES -------------------------- ??? Project No. 9654 145 ATTACHMENT "F" CURTAIN WALL SECTION 08900 PAGE 28 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [MAP] -------------------------------------------------------------------------------- XXX XX XXXXXXX 00000 Xxoject No. 9654 146 ATTACHMENT "G" SWISS RE AMERICA U.S. HEADQUARTERS TURNXX XXXSTRUCTION CO. NORTH CASTLE, NY 3/31/97 ADDENDUM #1 CURTAINWALL BIDDER QUESTIONS
Horizontal alignment. No Change Allowed
Horizontal alignment. The existing horizontal alignment will be developed from a survey of recovered existing street centerline monuments. This alignment will be used as the record centerline of improvement and the centerline of construction. Minor shifts in the travel lanes will be designed as tapers if the deflection angle of the shift is consistent with (not greater than) that as calculated for the design speed. Otherwise, a horizontal curve must be introduced or the design speed reduced. Turns at intersections will be designed on the basis of vehicle turn templates.
Horizontal alignment. (i) Subject to the other requirements of this Agreement the horizontal road geometry Design shall comply with the relevant design speed as described in Table 1 of Appendix D.
AutoNDA by SimpleDocs
Horizontal alignment. Horizontal curve deficiencies can best be identified by a review of As- Constructed plans, but superelevation rates need to be measured in the field. As a minimum, superelevation is to be corrected with the 3-R project. Additional mitigation (delineation, signing, etc.) may also be appropriate due to site-specific conditions. Again, the Region Traffic Engineer should be consulted for input.
Horizontal alignment. The Consultant is aware of the County’s desire to avoid impacting the property located south of Xxxx 000xx Xxxxxx. This property was identified as having an undocumented landfill. The horizontal alignment will be developed to maintain all grading within the southerly right-of-way of Xxxx 000xx Xxxxxx.

Related to Horizontal alignment

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Substantial Completion “Substantial Completion” means the stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the Owner’s opinion, the Work has progressed to the point such that all parts of the Work under consideration are fully operational and usable for intended purposes, as evidenced by a Certificate of Substantial Completion approved by the Owner. If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall notify Owner’s Designated Representative (sometimes referred to as the “ODR”) and request a determination as to whether the Work or designated portion thereof is substantially complete. If the ODR does not consider the Work substantially complete, the ODR will notify the Contractor giving reasons therefore. Failure on the Owner’s part to list a reason does not alter the responsibility of the Contractor to complete all Work in accordance with the terms of this Agreement. After satisfactorily completing items identified by Owner’s Designated Representative, the Contractor shall then submit another request for the ODR to determine Substantial Completion. If The ODR considers the Work substantially complete, The ODR will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final completion and final payment, shall establish the time within which the Contractor shall finish the punch list, and shall establish responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the terms and conditions of this Agreement. The certificate of Substantial Completion shall be signed by the Owner and the Contractor to evidence acceptance of the responsibilities assigned to them in such certificate. Substantial Completion (as defined in this agreement) for all stages of the Work shall be achieved on or before the following Substantial Completion date: DATE FOR SUBSTANTIAL COMPLETION: TBD Under no circumstances will the time for Substantial Completion exceed this date without a written amendment to this Agreement. THE TIMES SET FORTH IN THE CONSTRUCTION DOCUMENTS ARE AN ESSENTIAL ELEMENT OF THE AGREEMENT. TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF THE ESSENCE OF THIS AGREEMENT.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. Experience: A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.

  • Square Footage Buyer acknowledges that the square footage of the Property has not been measured by Seller, Seller’s broker or its auctioneer (including the square footage of the lot and home) and the square footage quoted on any marketing tools such as advertisements, brochures, MLS data, the auction website and any other information provided is based on information supplied to Seller and is deemed approximate and not guaranteed. Buyer further acknowledges that Buyer has not relied upon any such marketing tool and that such tools are not representations and/or warranties of Seller or its agent.

Time is Money Join Law Insider Premium to draft better contracts faster.