Handrails Sample Clauses

Handrails. Sometimes a handrail needs to be removed before we install the stairlift. We would normally ask you to arrange for a local tradesman to do this. We may agree to remove your handrail free of charge. However, we will not carry out remedial work (such as replastering and redecorating) afterwards. We also will not fit the handrail somewhere else. If you would like us to carry out any remedial work or fit the handrail somewhere else, we could arrange for one of our subcontractors to do this for an extra charge.
AutoNDA by SimpleDocs
Handrails. It is required that handrails are used for both sets of stairs. RESPONSIBILITY FOR EQUIPMENT. During the time the Equipment is in the possession of USER and not in posses- sion of CITY, USER is held responsible for the Equipment. If the Equipment is lost or stolen under any circumstances while rented, regardless of fault or cause, USER agrees as an insurer to pay the fair market value and all costs of replacing the Equipment. If the Equipment is damaged under any circumstances while rented, regardless of fault or cause other than by wrongful or negligent act of the CITY and its employees and agents, USER shall be responsible and hereby agrees to pay all charges including labor costs to repair the Equipment. It is also understood and agreed that USER shall be responsible for the full rental rate for a period of thirty (30) days from the day of reporting the theft, loss, or total damage, or until CITY is compensated for the loss of the goods, whichever date shall first occur. USER shall furnish to CITY a police report demon- strating that the loss, theft, or total damage of the goods have been reported to the appropriate police agency. USER agrees to report any accident, loss of or damage to the rental equipment to CITY in writing immediately and not later than 24 hours after such accident, loss, or damage. LICENSES, PERMITS, TAXES, AND REGULATIONS. USER shall obtain at its own expense and comply with any licenses or permits required by law for USER’s event and use of the Equipment. Events may require a Special Event Permit (contact GPD at 000-000-0000) and compliance with copyright or trademark laws regarding musical compositions and re- cordings. USER is responsible for the payment of all taxes, fees and charges required by any legal authority associated with USER’s event or use of the Equipment. USER shall comply with all applicable federal, state and local laws.
Handrails. Ramps with a rise greater than 6 in (150 mm) or a run greater than 72 in (1830 mm) shall have handrails complying with 4.3.10 and 4.3.11.  See Figures 12 and 9 for required compliance  Near Unit #715: o grind or relevel concrete sidewalk to 2% grade or less on cross slope
Handrails. Ramp runs with a rise greater than 6 inches (150 mm) shall have handrails complying with 505. o See Figure 9 for required compliance  Garage Near Building 6: install handrails and edge protection above curb at ramp.
Handrails. Ramp runs with a rise greater than 6 inches (150 mm) shall have handrails complying with Section 505. o ANSI A117.1 [2003] 405.9 Edge Protection. Edge protection complying with Section 405.9.1 or 405.9.2 shall be provided on each side of ramp runs and at each side of ramp landings.
Handrails. It has been customary for the pipefitters to install pipe handrails as required in the plant. This method for general installation has proven satisfactory. However, in areas in- volving structural changes minor in scope, the method has been unsatisfactory because of scheduling difficulties in as- signing pipefitters to repair work of this nature. The resulting delay in handrail erection has created safety hazards due to forced use of temporary rope or xxxx xxxxx- cades around floor openings and platforms. In order to the use of temporary barricades, both pipefitters and field repairpersons will install handrails on minor jobs with assistance from welders as required, e.g. replacement of handrail removed by field repair groups to install or remove equipment and install handrail at mis- cellaneous small access platforms x (square) and under, erected by the field repair group, Major handrail installa- tions scheduled for the Section will be assigned to the pipefitters, assisted where needed by other appropriate skills or yard crew.
Handrails. DIVISION 6 - WOOD & PLASTICS Not used DIVISION 7 - THERMAL AND MOISTURE PROTECTION
AutoNDA by SimpleDocs
Handrails. Clean all handrails with proper cleaning solution of all dust, smudges, handprints and fingerprints. Remove graffiti.
Handrails a. Balcony: SS handrails in lay with toughened glass as approved by architect.
Handrails. Handrails will be installed solely for the protection of personnel on each project. They shall not be removed, changed, used for support or abused in any manner. If subcontractors need railing removed for access, they will first contact Xxxxxx Construction for approval. No railings will be removed without the approval of Xxxxxx Construction, Inc. Any railing removed without the approval of Xxxxxx Construction or any railing damaged due to negligence on the part of a subcontractor shall be replaced by the responsible subcontractor. If replaced by Xxxxxx Construction, the responsible subcontractor will be charged for the cost of replacement.
Time is Money Join Law Insider Premium to draft better contracts faster.