Design Schedule Sample Clauses

Design Schedule. 1.4.1 Within 10 days after execution of this Agreement, or other period agreed with the Contracting Authority, the A/E shall submit, for approval by the Contracting Authority and Owner, a Design Schedule for the performance of the A/E’s Services.
AutoNDA by SimpleDocs
Design Schedule. The periods of the Design Schedule stated on Page 2 of the Agreement form are defined as follow:
Design Schedule. The project design schedule, excluding approval time, is approximately five (5) months with the following times for each design phase:
Design Schedule. The Contractor shall complete the various design documents by the dates set forth in the Schedule.
Design Schedule. The Architect/Engineer's services shall be performed as expeditiously as is consistent with professional skill and care and the orderly progress of the Architect/Engineer's services. The Architect/Engineer and Owner hereby agree to the design schedule which has been incorporated and made a part of the Construction Schedule attached as Exhibit 4 hereto. Time limits established by this schedule shall not, except for reasonable cause, be exceeded by the Architect/Engineer. Any adjustments to the schedule shall be void and of no force and effect until such adjustments are agreed to in writing by Owner and Architect/Engineer.
Design Schedule. A schedule of Project activities and events, showing initiation point, duration, and ending points. The Design Schedule indicates time allowed for reviews by the City staff. The Design Schedule shall be drafted by the Design Consultant and subject to the Director’s approval. The Design Schedule may be updated in accordance with the terms and conditions of this Agreement, without the need of a contract amendment, provided that the revised Design Schedule has been approved by the Director in writing.
Design Schedule. 1. Upon Notice of Authorization issued by OWNER, Program Verification Phase submittals shall be submitted to OWNER within days.
AutoNDA by SimpleDocs
Design Schedule. 4.3.1. For every Project, Architect shall prepare, submit for District’s acceptance, and maintain a design schedule detailing, Architect’s scheduled performance of the Services.
Design Schedule. [*] * This portion of the Attachment has been omitted pursuant to a Request for Confidential Treatment under Rule 24b-2 of the Securities Exchange Act of 1934. The complete Attachment, including the portions for which confidential treatment has been requested, has been filed separately with the Securities and Exchange Commission. SIGNATURE VERSION Part B Items /Deliverables Customer Items and IBM Deliverables Customer Items IBM Deliverables Technical detail to complete Customer design, i.e. IBM Model/Tool Design Kits - Library/tool requirements Testability requirements - Netlist processing requirements Module physical outline drawing - Test requirements Completed Customer design specification approved by Customer/IBM - Simultaneous switch requirements Estimated schedule based on netlist delivery checkpoints - Clocking requirements EDIF/Verilog netlist, SDF, and timing reports - Power estimation Placed VIM netlist w/estimated parasitics - Operating/environmental conditions Placed/Routed VIM netlist w/extracted parasitics - Die/package requirements Final test coverage for design - Package I/O requirements Package/image pinout definition - Memory macros Generic package models - Cores and PLL’s SSO and noise guidelines/requirements - Custom circuits, macros, I/O’s Datasheets for cores - Product life IBM ASIC Application Notes - Logic gate count ASIC Databooks - Physical design constraints Reliability and thermal support position based on Customer environmentals, Product life, and cycling requirements Chip I/O assignment Prototypes Chip timing assertion files Floorplanning files Special logic functions placement directives Prototype and production forecasts Floorplanning definition Delivery of netlists (analysis, if required, Floorplan, Preliminary and Final) and other design deliverables documented in the IBM ASIC Release Documents (Release to Floorplanning (RTF), Release to Preliminary (RTP), Release to layout (RTL), Release to Manufacturing (RTM) Sign-off of RTL/RTM release documents Prototype Acceptance
Design Schedule. The “Preliminary Design Schedule” attached hereto as Exhibit B sets forth a preliminary schedule for the Design Phase milestones.