Breaker Sample Clauses

Breaker. Breaker failure protection for the 115kV breaker will trip the appropriate adjacent breakers and send direct transfer trip to Connecting Transmission Owner’s Mohican and Schaghticoke Substations. For loss of SF6, the breaker must trip and block close. DTT receive from Schaghticoke and Mohican Substations will be required to trip the Interconnection Customer’s 115kV breaker for a line relay operation or breaker failure at Schaghticoke and Mohican Substations.
AutoNDA by SimpleDocs
Breaker. Breaker failure protection shall be provided for the 46kV breaker. This scheme must trip the local generation and send DTT to the Connecting Transmission Owner’s Boonville Station. Note: When the Small Generating Facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on the Connecting Transmission Owner’s 46kV system for remote backup.
Breaker. Breaker failure protection shall be provided for the 115kV breaker; this protection must trip the appropriate adjacent breakers and send DTT to the Connecting Transmission Owner’s Arcade and Five Mile Substations. For loss of SF6, the breaker must trip and block close. DTT received from Connecting Transmission Owner’s Arcade and Five Mile Substations will be required to trip the Interconnection Customer's 115kV breaker for a line relay operation or breaker failure at Connecting Transmission Owner’s Arcade and Five Mile Substations. The Interconnection Customer shall provide on/off switches for the DTT schemes.
Breaker. Breaker failure protection shall be provided for the 115kV breaker; this protection must trip the appropriate adjacent breakers and send direct transfer trip to Connecting Transmission Owner’s Long Lane Substation and LaFarge’s LaFarge Substation for transformer faults. (Note: If the Q598 Albany County 2 Solar Project is also constructed, as described under separate agreement between Interconnection Customer, Connecting Transmission Owner, and the NYISO, tripping of the Albany 2 Collector Substation by DTT will also be required). For loss of SF6, the breaker must trip and block close. (Note: When the facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on Connecting Transmission Owner’s 115kV system for remote backup). DTT receive from Connecting Transmission Owner’s Long Lane Substation will be required to trip the Interconnection Customer's 115kV breaker for a line relay operation, R6 breaker failure, and if R6 is opened at the Long Lane Substation. Additional channels available on the GARD 8000s shall be used for this protection scheme. (Note: If the Q598 Albany County 2 Solar Project is also constructed, as described under separate agreement between Interconnection Customer, Connecting Transmission Owner, and the NYISO, tripping of the Albany 2 Collector Substation by DTT will also be required).
Breaker. Breaker failure protection shall be provided for the 69kV breaker; this protection must trip the appropriate adjacent breakers and send DTT to Connecting Transmission Owner’s Florida and Ephratah Substations. For loss of SF6, the breaker must trip and block close. (Note: When the Small Generating Facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on Connecting Transmission Owner’s 69kV system for remote backup.) DTT receive from Connecting Transmission Owner’s Florida and Ephratah Substations will be required to trip Interconnection Customer’s 69kV breaker for line relay operation or breaker failure at the Florida or Ephratah Substation. The Interconnection Customer shall provide on/off switches for the DTT schemes.
Breaker. Breaker failure protection shall be provided for the 34.5kV breaker; this protection must send DTT to the Connecting Transmission Owner’s Maplehurst and Machias Substations. For SERVICE AGREEMENT NO. 2572 loss of SF6, the breaker must trip and block close. (Note: if the Small Generating Facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on the Connecting Transmission Owner’s 34.5kV system for remote backup.) DTT receive from Connecting Transmission Owner’s Maplehurst and Machias Substations will be required to trip the Interconnection Customer's 34.5kV breaker for a line relay operation or breaker failure at Connecting Transmission Owner’s Maplehurst and Machias Substations. The Interconnection Customer shall provide on/off switches for the DTT schemes.
Breaker. Breaker failure protection shall be provided for the 69kV breaker; this protection must trip the appropriate adjacent breakers and send DTT to Connecting Transmission Owner’s Johnstown Substation. For loss of SF6, the breaker must trip and block close. (Note: When the Small Generating Facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on Connecting Transmission Owner’s 69kV system for remote backup.) DTT receive from Connecting Transmission Owner’s Johnstown Substation will be required to trip Interconnection Customer’s 69kV breaker for line relay operation or breaker failure at the Johnstown Substation. The Interconnection Customer shall provide on/off switches for the DTT schemes.
AutoNDA by SimpleDocs
Breaker. Breaker failure protection shall be provided for the 115kV breaker (52-1) that will send direct transfer trip (“DTT”) to Connecting Transmission Owner’s Xxxxxxx Road Substation to trip R20 and R50 for failure of the 52-1 breaker (R80). For loss of SF6, the breaker must trip and block close. DTT receive from Connecting Transmission Owner’s Xxxxxxx Road Substation will be required to trip the Interconnection Customer’s 115kV breaker for a line relay operation, R20 or R50 breaker failure, and if both R20 and R50 are open at the Xxxxxxx Road Substation. SERVICE AGREEMENT NO. 2591
Breaker. Breaker failure protection for the 115kV breaker will trip the appropriate adjacent breakers and send direct transfer trip to Connecting Transmission Owner’s Luther Forest and Schaghticoke Substations. For loss of SF6, the breaker must trip and block close. (Note: When the facility’s interrupter fails to interrupt for internal station faults and loss of SF6 condition, the Interconnection Customer is not to rely on the Connecting Transmission Owner’s 115kV system for remote backup.) DTT receive from Schaghticoke and Luther Forest Substations will be required to trip the Interconnection Customer’s 115kV breaker for a line relay operation or breaker failure at Schaghticoke and Luther Forest Substations. Interconnection Customer will provide On/Off switches for the DTT schemes.
Breaker. Breaker failure protection shall be provided for the 115kV breaker. This protection must trip the appropriate adjacent breakers and send direct transfer trip to the Eastover and Schaghticoke Substations. For loss of SF6, the breaker must trip and block close. (Note: When the Interconnection Customer’s interrupter fails to interrupt for internal station faults and loss of SERVICE AGREEMENT NO. 2638 SF6 condition, Interconnection Customer is not to rely on the Connecting Transmission Owner’s 115kV system for remote backup.) DTT receive from the Schaghticoke and Eastover Substations will be required to trip the Interconnection Customer’s 115kV breaker for a line relay operation, or breaker failure at the Schaghticoke and Eastover Substations. The Interconnection Customer shall provide on/off switches for the DTT schemes.