Administration Building Sample Clauses

Administration Building. The administration building – one story free standing, office computer system, telephone system, office copier and fax machine and office furniture and any other office equipment and personal property for the administration building shall be the sole and absolute cost and responsibility of Owner and Design-Builder shall have no responsibility in regards thereto.
AutoNDA by SimpleDocs
Administration Building i. Counters
Administration Building i. The reception counter is inaccessible because the top is 41 inches above the finished floor. Provide a counter on an accessible route such that a portion of the counter is at least 36 inches wide and no more than 36 inches above the finished floor, or provide an auxiliary counter with a maximum height of 36 inches in close proximity to the main counter, or provide equivalent facilitation. Equivalent facilitation may be provided in the form of a folding shelf attached to the main counter, an auxiliary table nearby, a clip board made available to the public, or other means. Standards §§ 4.1.1(2), 7.2(2), 4.1.3(1), ii. Men’s Toilet Room
Administration Building. Building and administrative offices located at 00000 X. Xxxxxx Road, Gurnee, Illinois.
Administration Building. The structure located on the Land and used for Keys Club’s administrative offices.
Administration Building. 2 full time 1 full time t 2 full time (supplemented by caretaker staff as required)
Administration Building. B. Memorial Union Building C. Student Development Complex
AutoNDA by SimpleDocs
Administration Building. The existing HVAC system operating schedule is generally from 6:30 AM to 6:00 PM Sunday through Saturday with Unoccupied operation during all other hours. During the guarantee period, the HVAC system operating schedule shall be 6:00am to 7:00pm Monday through Friday, with unoccupied operation during all other hours. The existing occupied heating setpoint is 73°F and the unoccupied heating setpoint is 70°F. During the guarantee period, the occupied heating setpoint shall be an average of 70°F and the unoccupied heating setpoint shall be 55°F. The existing cooling setpoints are estimated at 74°F occupied and 85°F unoccupied. During the guarantee period, the occupied cooling setpoint shall be 74°F and the unoccupied cooling setpoint shall be 85°F. Existing schedules and setpoints are based on detailed review of Building Management Systems/thermostats, interviews with staff, and temperature data logging results. Proposed schedules are based on information provided by the Facilities Department. WEEKDAY WEEKEND Existing HVAC Start Time Proposed HVAC Start Time Existing HVAC Start Time Proposed HVAC Start Time Existing HVAC Stop Time Proposed HVAC Stop Time Existing HVAC Stop Time Proposed HVAC Stop Time HEATING COOLING Existing Occupied Setpoint Proposed Occupied Setpoint Existing Occupied Setpoint Proposed Occupied Setpoint 73°F 70°F 74°F 74°F Existing Unoccupied Setpoint Proposed Unoccupied Setpoint Existing Unoccupied Setpoint Proposed Unoccupied Setpoint 70°F 55°F 85°F 85°F Notes:
Administration Building. A new terminal administration building will be constructed. It will be a steel frame building with brick exterior and metal roof. Finishes will be commercial grade and furnishings will be included in the specifications. The administration building will house:
Administration Building. Install one (1) Outdoor IP day/night dome camera placed atop the door entry area for viewing the entrance into the building. The camera will be powered from new Xxx Switch placed in IDF rack. Contractor will install a video management system to store video for up to 30days onsite. All installation, labor and set-up is included. ▪ Hardware provided by County: 🢭 Outdoor IP day/night dome - qty. 1
Time is Money Join Law Insider Premium to draft better contracts faster.