Additional Scope Sample Clauses

Additional Scope. UNLV may, at its sole option, develop additional job-specific scopes of work (“Scopes of Work” or “SOW”). In the event that UNLV elects to request additional services from Contractor, additional scope, schedule, and compensation based on the hourly rates set forth in Exhibit C will be negotiated with Contractor. Nothing in this Contract shall be construed as guaranteeing Contractor that any additional Scopes of work will be actually requested.
AutoNDA by SimpleDocs
Additional Scope. 2 3.0 TERRESTRIAL NETWORK DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Additional Scope. Enhance the painting scheme for the interior corridor walls with graphic bands, "PROWL" verbiage, and wall graphics in the HUB spaces and Media Center. While we included time and effort in our original scope to provide a level of wall graphics in the hallways of the existing building, additional effort was required to provide the graphic way­ finding accent color banding and the placement and inclusion of the "PROWL" verbiage within the graphic wayfinding bands throughout the new and existing portions of the school. Additionally, we spent significant time searching and providing graphic options for the Hub Spaces and MPRIGym graphic areas. Our efforts resulted in getting the copyrighted photographic images for the mural walls at the Hub Spaces donated to the project at no cost. This additional work involved the extra services of Architects+ LLC. Additional Fee: $1,400.00
Additional Scope. Refinishing of the existing exterior building soffits at selected areas. It was requested to repair and refinish areas of damaged and deteriorated stucco at the soffits of the existing building. This work required field investigations to document the existing conditions and prepare the construction documents that are included in GMP 3. This additional work involved the extra services of Architects + LLC with input from Xxxxxxxx Engineering.. Additional Fee: $2,300.00
Additional Scope. Providing structural openings at existing xxxxx ends for new mechanical equipment access and installation, along with providing new metal siding at existing end gables and roof offsets. It was requested to provide services to prepare design and construction documents to remove and replace the existing extensively damaged metal siding at the end gables and roof offsets at the existing building. This work also involved designing the reframing of the existing end gables to allow removal of existing mechanical equipment and the installation of new mechanical equipment. This additional work involved the extra services of Architects LLC, Xxxxxxxx Engineering, and CR Engineering. Additional Fee: $4,900.00
Additional Scope. Added Construction Administration Our current professional services agreement includes providing construction administration services through August 2022. The new project schedule has construction being completed at the end of 2022 requiring an additional 4 months of construction administration services. These services will include weekly meetings along with typical construction review and coordination efforts by the entire design team. This time extension will also result in multiple substantial completion inspections as portions of the building are accepted for occupancy. This additional work will involve the extra services of Architects+ LLC, Xxxxxxxx Engineering, CR Engineering, and JP Electrical, Odyssey Engineering, and LA Studios. Additional Fee: $12,900.00
Additional Scope. Researching and Adding Anti-Graffiti coating to new concrete masonry at GMP 2 and GMP3. No Charge This additional work involved significant research into adding anti-grafitti coatings that would be appropriate to the CMU being utilized for the Xxxxx Middle School gymnasium and classroom addition to the scope of the project. The work also involved research into a coating that would be compatible with the CMU water repellent which resulted in a revision of the Water Repellent specification and addition of the Anti-Graffiti Coatings specification. The project drawings were also revised to reflect the addition and extent of the Anti-Graffiti Coating.
AutoNDA by SimpleDocs
Additional Scope. Replacement of bathroom fixtures at existing building restrooms: No Charge This work involved additional field investigation, hazardous material evaluation, and construction document preparation to catalog the existing conditions related to replacement of soap dispensers and toilet paper dispensers in the school's existing restrooms.
Additional Scope. Services outside the scope described in the Order Form require an amendment, variations schedule or change order (when available) and additional fees may apply.
Additional Scope a) The bidder will be expected to provide the OEM letter of support.