SCF definition
SCF means standard cubic feet.
SCF means standard cubic foot.
SCF means standard cubic foot of Gas;
Examples of SCF in a sentence
Students must satisfy any course prerequisites as required by the current SCF catalog.
All dual enrollment applications and approval forms must be submitted to SCF by published deadlines.
This SCF Student I.D. will also act as a library card for the student.
Students obtain their grades by conferring in person with their instructors or by accessing them online via SCF Connect.
The early admission student enrolls full-time as an SCF college student and receives both college and high school credit upon successful completion of the course(s).
More Definitions of SCF
SCF where “SCF” means the quantity of Gas which, when saturated with water vapour at a temperature of sixty degrees Fahrenheit (60°F) and an absolute pressure of fourteen decimal six nine six (14.696) pounds per square inch, occupies one (1) cubic foot, and “MMscfd” means MMscf per day.
SCF means satellite control facility.
SCF when applied to Gas means the volume of Gas that occupies one (1) cubic foot of space measured dry under an absolute pressure of fourteen point six nine six (14.696) pounds per square inch and a temperature of sixty
SCF means the Strategic Climate Fund established in accordance with, and for the purposes set forth in, the SCF Governance Framework Document, under the framework of the CIF.
SCF or “standard cubic foot of gas” shall mean the amount of Gas necessary to fill a cubic foot of space when the Gas is at a pressure of 14.65 pounds per square inch absolute and a temperature of 60 degrees Fahrenheit.
SCF means SCF-VII, L.P., a Delaware limited partnership.
SCF means standard cubic feet at 60°F and at atmospheric pressure equal to 29.92 inches of mercury absolute, measured by standard sharp edge orifice plate and differential pressure transmitters located at the Fertilizer Plant. The measured flow shall be pressure and temperature compensated and totalized by the Fertilizer Plant’s Honeywell process control computer (TDC 3000) or any replacement computer. All transmitter signals and computer calculations are available to the Refinery through the existing communications bus for verification. Calibration of the transmitters shall be done at least annually and may be done more frequently at Refinery Company’s request.