Required Equipment definition

Required Equipment means such equipment and systems required to be installed at the Customer’s site in order for Customer to access the System and meeting the specifications set forth in Schedule 1.2, as such specifications may be revised from time to time by EasyHRweb.
Required Equipment shall have the meaning set forth in Section 5.7(a).
Required Equipment. I will wear an approved life jacket at all times while participating in the Water Sports Activities. I also acknowledge and agree that I will carry on board of any water vessel all additional safety equipment as required by the Releasees. I agree that I shall satisfy myself of any questions or concerns that I may have arising from the use of an approved life jacket and all additional safety equipment before commencing the Water Sports Activities.

Examples of Required Equipment in a sentence

  • Both types of colloids when treated with “capping” ligands (aliphatic and heterocyclic amines, amides etc.

  • If the TMDL implementation plans include compliance schedules beyond the permit term, monitoring and other requirements are being included in this order to monitor progress towards achieving future compliance.

  • The Required Equipment Receive Date is noted in the table to reflect when equipment is needed.

  • Risk in the Required Equipment passes to you on delivery, and title to the Required Equipment passes to you when we receive payment in full.

  • Title to the Required Equipment passes to you upon payment in full.


More Definitions of Required Equipment

Required Equipment means all computer hardware, software and other equipment or facilities including servers, power supply, workstations, printers, concentrators, communications equipment and routers identified by Cognizant as necessary for and used by Xxxxxxx to receive the Services as specified in a Statement of Work or otherwise specified by Cognizant in writing.
Required Equipment. All street-legal vehicles, as defined by IC Title 9, must display the company-approved decal kits and must be maintained with the following equipment: Amber light bar (magnetic mount) Tattletale Wireless Alarm kit (Mobile/Road Patrols only) Emergency roadside kit (flares, pylons, etc.) First Aid Kit Handheld spotlight Jumper cables Snow chains/cables (where regionally appropriate) Billing: TBD based on RFP responses. U. Monitoring
Required Equipment means such equipment and systems, including, without limitation, telecommunications links and Internet connectivity, required to be installed and operational at Licensee's site in order for Licensee to access the ASP Service.
Required Equipment means such equipment and systems required to be installed at the Customer’s site in order for Customer to access the System and meeting the specifications set forth in Schedule 1.2, as such specifications may be revised from time to time by primeFORCE.
Required Equipment hand-held console, computer, and certified meter. DDC Controllers Prior to any work being executed, ACC will seek approval from maintenance supervisor; Check all DC and AC Power supplies for proper voltage levels; Verify controller operation and communication on LAN; Visually inspect circuit boards; Clean Controller Panel; Verify panel I/O schedule is correct; Inspect panels, cabling and connections for damage and corrosion Complete report.
Required Equipment. Hand Held Console or Computer Contractor shall perform frequency drive preventative maintenance as listed in OEM documentation, including but not limited to items described below. All frequency drive preventative maintenance visits must be scheduled and approved by building management staff. Contractor must store spare cooling fans onsite. The services outlined below are to be included, at a minimum, as frequency drive preventative maintenance to the County at least once every six (6) months: Visual inspection of circuit boards and components; address issues as needed Cleaning with dry air Clean dust and direct from heat sink fins Check electrical connections and tighten with correct torque wrench/driver as needed; Check and replace cooling fans as needed Exercise drive by commanding on and off through BMS and verify that drive is responding as expected; Exercise drive by changing speed reference and verify that drive is responding as expected; Replace air filter as needed The services outlined below are to be included, at a minimum, as frequency drive preventative maintenance to the County at least once per year: Check output power with oscilloscope for each drive; printout of sine wave for each from must be provided to the County for review Perform an IR thermal scan of the drives power input and power output; provide the County a report of IR scan results for each drive. The services outlined below are to be included, at a minimum, as frequency drive preventative maintenance to the County at least once per preventative maintenance visit: Provide a report detailing all preventative maintenance tasks performed and list any deficiencies encountered for each drive.
Required Equipment. THIS AGREEMENT is made this 30th day of December, 1990, by and between PHILADELPHIA REGIONAL PORT AUTHORITY ("PRPA"), a body politic and corporate and a public authority and instrumentality of the Commonwealth of Pennsylvania, and XXXX CARGO SYSTEMS, INC. ("XXXX"), a Delaware corporation.