PSE&G definition
Examples of PSE&G in a sentence
Contractor is also not responsible for the cost of lost/reduced power/energy while the system is under repair or as a result of utility service problems (e.g. PSEG LI), or solar/shading issues.
If the initiating disturbance is a fault causing any phase voltage at either the PSE&G Bergen 230kV AC bus or the West 49th Street 345kV Substation 345kV AC bus to decrease below 80% of the pre-disturbance value, then recovery time shall be measured from the time of fault clearing.
The toll-free customer service telephone number for each EDC/utility is: JCP&L: ▇▇▇-▇▇▇-▇▇▇▇; PSE&G: ▇▇▇-▇▇▇-▇▇▇▇; Atlantic City Electric: ▇▇▇-▇▇▇-▇▇▇▇; O&R: ▇▇▇-▇▇▇-▇▇▇▇.
The Project design will be in accordance with all applicable PSEG Long Island transmission design criteria and applicable industry standards.
The Developer shall also provide metering data from the meters at the PSE&G Substation to the Connecting Transmission Owner and NYISO, upon request.