Line 2 definition
Line 2 means the pipeline consisting of predominately 36" pipeline and associated facilities.
Line 2. “Other Income” shall mean all other income becoming due to the Company in the relevant Accounting Period, excluding any income from investments and any realised or unrealised gains on investments and excluding any amount received or becoming due under Ceded Reinsurance;
Line 2. Beginning at a point on the west line of the Northwest Quarter of Section 21, distant 1.0 foot north of the southwest corner thereof; thence run northeasterly at an angle of 92 degrees 05 minutes 00 seconds (as measured from south to east) from said west line of 1521.8 feet; thence deflect to the right at an angle of 01 degree 03 minutes 00 seconds for 1100 feet and there terminating.
Examples of Line 2 in a sentence
N/A * 3 Identify all applicable assumed names or DBA names of the Proposer or Proposer's subsidiaries in Line 1 or Line 2 above.
None * 3 Identify all applicable assumed names or DBA names of the Proposer or Proposer's subsidiaries in Line 1 or Line 2 above.
If cost sharing/match is required, use the second row (Line 2) to report the total non-federal funds (f) for the first year of your project only.
NA * 3 Identify all applicable assumed names or DBA names of the Proposer or Proposer's subsidiaries in Line 1 or Line 2 above.
Line 2 If you have a business name, trade name, DBA name, or disregarded entity name, you may enter it on line 2.
More Definitions of Line 2
Line 2 means the emissions sources identified in and described by paragraphs 7.2.1 and 7.2.2 of East Balt’s 2004 CAAPP Permit.
Line 2. City: State: Zip:
Line 2 will mean a second Product manufacturing line planned for installation at the Facility.
Line 2 means the North-South corridor of about 23 kilometers from Ambabadi to Sitapura in the city of Jaipur in the State;
Line 2. Beginning at a point on the west line of the Northwest Quarter of Section 21, distant 1.0 foot north of the southwest corner thereof; thence run northeasterly at an angle of 92°05’00” (as measured from south to east) from said west line for 1,521.8 feet; thence deflect to the right at an angle of 01°03’00” for 1,100 feet and there terminating. Together with that part of Tract A hereinbefore described, which lies within a distance of 35 feet southerly of a line run parallel with and distant 50 feet southerly of the following described line: Beginning at a point on “Line 2” hereinbefore described, distant 484.4 feet westerly of its point of termination; thence easterly on said “Line 2” for 484.4 feet and there terminating; containing 0.57 acres more or less Subject to township road right-of-way over the westerly 33 feet of said Southwest Quarter; also subject to Trunk Highway 14 right-of-way.
Line 2. Beginning at a point on the west line of the Northwest Quarter of Section 21, distant 1.0 foot north of the southwest corner thereof; thence run northeasterly at an angle of 92°05’00” (as measured from south to east) from said west line for 1,521.8 feet; thence deflect to the right at an angle of 01°03’00” for 1,100 feet and there terminating. Together with that part of Tract A hereinbefore described, which lies within a distance of 35 feet southerly of a line run parallel with and distant 50 feet southerly of the following described line: Beginning at a point on “Line 2” hereinbefore described, distant 484.4 feet westerly of its point of termination; thence easterly on said “Line 2” for 484.4 feet and there terminating; containing 0.57 acres more or less Subject to township road right-of-way over the westerly 33 feet of said Southwest Quarter; also subject to Trunk Highway 14 right-of-way. ▇▇▇▇▇ ENGINEERING LLC February 27, 2007 HIGHWATER ETHANOL, LLC PROPOSED ETHANOL PRODUCTION FACILITY LAMBERTON, MINNESOTA ATTENTION BIDDERS, HIGHWATER ETHANOL LLC HAS GIVEN ME DIRECTION TO SEND OUT THIS PACKAGE OF INFORMATION REGARDING THE (HWE) PHASE 1 MASS GRADING AND DRAINAGE PORTION OF WORK TO BE PERFORMED STARTING LATE MARCH TO EARLY APRIL 2007 FOR THE PROPOSED HWE ETHANOL FACILITY IN LAMBERTON, MINNESOTA. ATTACHED YOU WILL FIND: · LIST OF CONTRACTORS BIDDING ON PROJECT · BID TABULATION SHEET SHOWING QUANTITIES · GEOTECHNICAL REPORT · SET OF DRAWINGS THERE WILL BE A PRE-BID MEETING FOR THIS PROJECT FRIDAY MORNING, MARCH 2, AT 10 AM (CENTRAL STANDARD TIME). THE BIDS WILL BE DUE FRIDAY, MARCH 23, BY 12 PM (CENTRAL STANDARD TIME). PLEASE LOOK OVER THE PLANS AND HAVE ANY QUESTIONS YOU MAY HAVE READY FOR THE PRE-BID PHONE CONFERENCE. I CAN BE REACHED VIA EMAIL AT (▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇), BY PHONE AT ▇▇▇-▇▇▇-▇▇▇▇ OR BY FAX AT ▇▇▇-▇▇▇-▇▇▇▇. IF I AM UNABLE TO BE REACHED, PLEASE SPEAK WITH ▇▇▇▇▇▇ ▇▇▇▇▇▇. ▇▇▇▇ ▇. ▇▇▇, P.E. CIVIL ENGINEER ▇▇▇▇▇ ENGINEERING, LLC
Line 2 means the production line Supplier currently plans to add at the Plant which Supplier anticipates will be fully operational by July 1, 2009. "Line 17" means the production line Supplier's affiliate, SGL Technic Ltd., currently plans to add at its facility located in ▇▇▇▇ of Ord, Scotland, which Supplier anticipates will be fully operational by July 1, 2009.