Hot Start means the start of an engine within four hours after the engine is last turned off. The first hot start test run should be initiated 20 minutes after the cold start for Federal Test Procedure testing following Section 86.1327-90 of the Code of Federal Regulations, Title 40, Part 86.
Hot Start in relation to steam turbine, means the start up after a shutdown period of less than 10 hours (turbine metal temperatures below approximately 80% of their full load values)
Hot Start means the start of an engine within four hours after the engine is last turned off. The first hot start test run should be initiated 20 minutes after the cold start for Federal Test Procedure testing following

Examples of Hot Start in a sentence

  • Full Load For Cold Start: For Warm Start: For Hot Start: Minimum time on-line (hours from start initiation to stop initiation) Minimum time off-line (hours from stop initiation to start initiation) Normal Ramp Rate within operating range: (MW/Min.) Increase: Decrease: Emergency Ramp Rate: (MW/Minute) Increase: _ Decrease: Time to transfer from combined cycle to duct firing min.

  • Manufacturer provided Start-Up curves indicating maximum load ramping rates and temperature stabilisation periods for a Hot Start, Warm Start and Cold Start shall be submitted to BPDB by the Company prior to Financial Closing and shall thereon be considered as part of this Schedule 2.

  • Dispatch Ramp Rate *** (note 1) STG Sync to Full Load (Boiler in “Hot” Conditions *** *** (note 1) *** *** (note 1) Cold Start (***) *** STG Synchronization (note 1) Warm Start (***) *** STG Synchronization (note 1) Hot Start (***) *** STG Synchronization (note 1) Note 1: Predicted value from vendor proposal.

  • Full Load For Cold Start: For Warm Start: For Hot Start: Minimum time on-line (hours from start initiation to stop initiation) Minimum time off-line (hours from stop initiation to start initiation) Normal Ramp Rate within operating range: (MW/Min.) Increase: Decrease: Emergency Ramp Rate: (MW/Minute) Increase: Decrease: Time to transfer from combined cycle to duct firing min.

  • If the Generating Unit is in a Hot Shutdown and is in Standby Mode, the Generating Unit shall be able to deliver energy equivalent to Unit Capacity on a continuous basis within 30 minutes (such a Start being a Hot Start, as further defined below) of dispatch notification by PECO.


More Definitions of Hot Start

Hot Start means start up after a shutdown period of less than 10 hours.
Hot Start means the start of an engine within four hours after the engine is last turned off.
Hot Start means the start-up of a Train immediately after a continuous eight (8) hour period or less during which the Train has not been generating electricity.
Hot Start a start of a Unit in Combined Cycle Mode given that all of the breakers of that Unit's combustion turbine generator have been open for no more than eight (8) hours.
Hot Start means an engine emission test after starting a warmed-up engine. The first hot start Federal Test Procedure test run should be initiated 20 minutes after the cold start for Federal Test Procedure testing following Section 86.1327-90 of the Code of Federal Regulations, Title 40, Part 86.
Hot Start means an engine emissions test after starting a warmed-up engine. The first hot start Federal Test Procedure (FTP) test run should be initiated 20 minutes after the
Hot Start means starting a steam turbine when the first stage inner metal temperature is more than 500 degrees Fahrenheit and for gas turbines shall be defined as specified by the Bidder depending on the specific generating resource being proposed.