Examples of Geotechnical Reports in a sentence
Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, hydraulic analysis, geometric studies, preparing Bridge Condition Reports, Hydraulic Reports, Structure Geotechnical Reports, Type, Size and Location (TS&L) plans, Intersection Design Studies (IDSs), and Project Reports (categorical exclusion projects only).
The Consultant’s Phase I work, if required, may consist of conducting hydraulic and route surveys, subsurface utility engineering, preparing Structure Geotechnical Reports, drilling and analysis of soil borings, hydraulic analysis, geometric studies, and preparing project reports (Categorical Exclusion reports only).
Geotechnical Reports: Subsurface data has not been obtained for design purposes.
Phase I and/or II engineering services are required for the preparation of Phase I Project Reports, Bridge Condition Reports, Hydraulic Reports, TS&L’s, Structure Geotechnical Reports and the preparation of preliminary and final contract plans for roadway projects and replacement, rehabilitation or repair of various structures within the District.
Embankment Fill > 5 feet New alignment One every 500 feet with at least one through the greatest thickness of fill.Borings shall extend at least 2 times the total height of the proposed fill below the base elevation or 5 feetinto hard substratum (N>30).Modified from Checklists and Guidelines for Review of Geotechnical Reports and Preliminary Plans and Specifications.