Final Acceptance Test (FAT definition

Final Acceptance Test (FAT means the acceptance testing of the network End Points/ Access Points commissioned for the project at all/specified locations.
Final Acceptance Test (FAT means the acceptance testing of all the commissioned project components at all specified locations.
Final Acceptance Test (FAT means the acceptance testing of the network including equipment at SHQ, all DHQs, all SDHQs/ BLOCKs and all co-located & remote offices.

Examples of Final Acceptance Test (FAT in a sentence

  • XMUM shall perform Final Acceptance Test (FAT) to test the performance of equipment once the work of installation has been completed to confirm that the equipment is merchantable and fit for its intended use.

  • Final Acceptance Test (FAT): After successful installation of the equipment/Material in accordance with the requirements as mentioned in Contract, Final Acceptance Test will be conducted.

  • One is Provisional Acceptance Test (PAT) and another is Final Acceptance Test (FAT).

  • The period of insurance shall be from the date of Final Acceptance Test (FAT) till the end of contract.

  • Final Acceptance Test (FAT): After successful installation of the System in accordance with the requirements as mentioned in Schedule of Requirement, Final Acceptance Test will be conducted.


More Definitions of Final Acceptance Test (FAT

Final Acceptance Test (FAT means the acceptance testing of the Equipment/Service.
Final Acceptance Test (FAT means after successful installation of the equipment/material in accordance with the requirements as mentioned in this tender, FAT will be conducted. After successful testing, Acceptance Test Certificate will be issued by the Member Secretary, Tripura State Computerisation Agency ( A Society under Directorate of Information Technology, Govt. of Tripura).
Final Acceptance Test (FAT means the acceptance testing of the commissioned project components at specified locations.
Final Acceptance Test (FAT means the acceptance testing of the network including equipment at various levels.
Final Acceptance Test (FAT means the acceptance testing of the new network/connectivity/infrastructure setup.
Final Acceptance Test (FAT means the acceptance testing of the Co-location / IT Infrastructure facility for providing the Services as mentioned in the RFP.
Final Acceptance Test (FAT means a test conducted by ISCL or its representatives or its third party testing agencies as may be decided by ISCL to determine if the requirements and performance of the equipment and systems delivered by BEL as laid in solution document, and the documents referred in General Terms and Conditions meet the specified output, functionality and performance in standalone and integrated mode.