Eligible Installation definition

Eligible Installation means a plant which meets the eligibility criteria; “eligible purpose” means a purpose specified in regulation 3(2);
Eligible Installation means any Plant on a Site which is capable of Small Scale Low Carbon Generation and (except as provided otherwise in the FIT Order) all such Plant on the same Site which is capable of generating electricity from the same type of Eligible Low-carbon Energy Source is to be treated as a single Eligible Installation);
Eligible Installation means, on a Site, any Plant owned by the Generator which is capable of producing Small- scale Low-carbon Generation from the same type of Eligible Low-Carbon Energy Source, the Total Installed Capacity of which does not exceed the Specified Maximum Capacity, and which is more fully described in these terms;

Examples of Eligible Installation in a sentence

  • The Propane Marketer is responsible for documenting that an Eligible Installation has occurred, that all Eligible Appliances have been correctly identified, and that a Safety Inspection has been completed and submission of the completed application to KYPERC.

  • Otherwise, the project will be deemed to be delinquent and may be subject to corrective action at NYSERDA's sole discretion including but not limited to termination of the Contract and/or withholding the awarding of further contracts to the involved Eligible Installation Company based on the company's overall portfolio of then delinquent projects.

  • If You begin generating export different to that from Your Installation, We shall treat this as a separate Eligible Installation.


More Definitions of Eligible Installation

Eligible Installation means, on a Site, any Plant owned by the Generator which is capable of producing Small- scale Low-carbon Generation from the same type of Eligible Low-Carbon Energy Source, the Total Installed Capacity of which does not exceed the Specified Maximum Capacity, and which is more fully described in the Term Sheet; “Eligible Low-carbon Energy Source” means the sources of energy or technology as defined in the FIT Order; “Eligibility Criteria” means any requirements or qualification criteria imposed by the Authority from time to time in relation to any aspect of this Scheme;
Eligible Installation means, on a site, any equipment, apparatus or appliance used to generate electricity relying wholly or mainly on an Eligible Low-carbon Energy Source, where the maximum capacity at which such equipment, apparatus or appliance could be operated for a sustained period without causing damage to it does not exceed the maximum capacity of 5MW (2kW in the case of combined heat and power) as specified in the FIT Order;
Eligible Installation means any plant on a site which is capable of small-scale low-carbon generation: and except as provided otherwise in the FiT Order all such plant on the same site which is capable of generating electricity from the same type of eligible low-carbon energy source is to be treated as a single eligible installation. Export Meter(s) means the meter (or meters) that measures how much electricity goes from your Generation Unit(s) to the Electricity Network.
Eligible Installation means any installation which complies with clause 2 of this Schedule; “Eligible Low-carbon Energy Source” means the following sources of energy or technology:
Eligible Installation means Plant which is capable of Small-scale Low-carbon Generation with the Specified Maximum Capacity and meets the following conditions:
Eligible Installation means, on a Site, any Installation owned by a FIT Generator capable of producing Small-scale Low-carbon Generation from the same type of Eligible Low-carbon Energy Source, the Total Installed Capacity of which does not exceed the specified maximum Declared Net Capacity; “Export” means the flow of electricity at any instant in time from an Eligible Installation onto a distribution system or transmission system and, if the FIT Licensee so elects, accounted for in settlement in accordance with the BSC, and Export used as a verb shall be construed accordingly; “Export Payment” means the sum paid to the FIT Generator or Nominated Recipient, as applicable, by a FIT Licensee, for FIT Export in any period, calculated by reference to the Export Tariff and Export Meter Reading or Deemed Export Reading; “FIT Licensee” means the collective term for Mandatory FIT Licensees and Voluntary FIT Licensees;
Eligible Installation means, on a Site, any Installation owned by a FITs Generator capable of producing Small-scale Low-carbon Generation from the same type of Eligible Low-carbon Energy Source, the Total Installed Capacity of which does not exceed the specified maximum Declared Net Capacity; “Eligible Low-carbon Energy Source” means the following sources of energy or technology: