Ditto definition

Ditto means the whole of the preceding description in which it occurs. Where it occurs in description of succeeding item it shall mean the same as in the first description of the series in which it occurs except as qualified in the description concerned. Where it occurs in brackets it shall mean the whole of the preceding description which is contained within the appropriate brackets.
Ditto. ’ shall mean the whole of the preceding description except as
Ditto means the whole of the preceding description except as qualified in the description. Where it occurs in descriptions of succeeding terms it shall mean the whole of the preceding description which is contained within the appropriate brackets.

Examples of Ditto in a sentence

  • Ditto marks are not considered writing or printing and shall not be used.

  • Ditto marks or words such as “SAME” shall not be used in the Proposal Form.

  • Ditto marks are not considered writing or printing and shall not be used.2. In the event that there is a discrepancy between the unit prices and the extended totals, the unit prices shall prevail.

  • Ditto marks or words such as "SAME" on the Proposal Form are NOT considered writing and must not be used.

  • Ditto marks or words such as “SAME” shall not be used in the Bid Form.


More Definitions of Ditto

Ditto means as described before or as above described
Ditto means the whole of the work described in detail in the preceding item, except as qualified in the description in which it occurs.
Ditto means the whole of the preceding description except as qualified in the description in which it occurs. Carried to Collection -
Ditto means: The whole of the preceeding, description except as
Ditto means the whole of the preceding description in which it occurs. Where it occurs in description of succeeding item it shall mean the same as in the first description of the series in which it occurs except as qualified in the description concerned. Where it occurs in brackets it shall mean the whole of the preceding description which is contained within the appropriate brackets. 1.06 Site LocationThe site of the Contract Works is Narumoru within Nyeri County. The tenderer is recommended to visit the site and shall be deemed to have satisfied himself with regard to access, possible conditions, the risk of injury or damage to property on/or adjacent to the site, and the conditions under which the sub-contract Works shall have to be carried out and no claims for extras will be considered on account of lack of knowledge in this respect. 1.07 Duration of Sub-ContractThe Contractor shall be required to phase his work in accordance with the Main contractor’s programme (or its revision). 1.08 Scope of Contract WorksThe contractor shall supply, deliver, unload, hoist, fix, test, commission and hand-over in satisfactory working order the complete installations specified hereinafter and/or as shown on the Contract Drawings attached hereto, including the provision of labour, transport and plant for unloading material and storage, and handling into position and fixing, also the supply of ladders, scaffolding the other mechanical devices to plant, installation, painting, testing, setting to work, the removal from site from time to time of all superfluous material and rubbish caused by the works. The contractor shall supply all accessories, whether of items or equipment supplied by the Sub-Contractor but to be fixed and commissioned under this contract. 1.09 Extent of the Sub-contractor’s DutiesAt the commencement of the works, the contractor shall investigate and report to the Engineer if all materials and equipment to be used in the work and not specified as supplied by the others are available locally. If these materials and equipment are not available locally, the contractor shall at this stage place orders for the materials in question and copy the orders to the Engineer. Failure to do so shall in no way relieve the contractor from supplying the specified materials and equipment in time. Materials supplied by others for installation and/or connection by the Contractor shall be carefully examined in the presence of the supplier before installation and connection. Any...
Ditto means the whole of the preceding description except as qualified in the description in which it occurs.
Ditto means the whole of the preceding description except as qualified in the description in which it occurs. Carried to Collection - A B C “As described” shall mean as described previously in a foregoing Bills, Preambles, l or in the Public Works, General Specification for Building Works 1976 Edition or any subsequent revision thereof. Progress Schedule The Contractor shall, upon receiving instructions to proceed with eth works, draw up a Time and Progress Schedule to which the works are to be carried out and stating the appropriate dates. This Time and Progress Schedule is to be agreed with the Architect and no deviation from the order set out in this Schedule will be permitted without the written consent of the Architect. The Main Contractor will be responsible for agreeing the above programme with all Sub-Contractors including the Nominated Sub- Contractors and Nominated Suppliers.