Walkway Sample Clauses

Walkway. 23. The Subdivider shall construct and install to the satisfaction of the Municipality a concrete walkway with a minimum width of 6 metres (19.69 feet) along the length of Block 58 as shown on the Phase II Plan. The Subdivider shall install a wood board privacy fence 1.8 metres (6 feet) in height along the boundaries of the above-noted walkways to the satisfaction Municipal Engineer and in accordance with the Municipality’s Infrastructure Design Standards. The Subdivider shall also install two pairs of bollards to control access, with one pair located at the westerly limit of Block 58 as shown on the Phase II Plan and with the other pair located at the easterly limit of Block 58 as shown on the Phase II Plan, all to the satisfaction of the Municipal Engineer. RECREATIONAL TRAIL
Walkway. The City's Designee and the Company shall cooperate in approving the final design and location of the Walkway prior to construction of the Walkway. If the mutually approved location of the Walkway causes a change in the configuration of the Site as specified in Exhibit A, then this Agreement will be amended to reflect the revised configuration.
Walkway. Purchasers of Lots 61 and 62 on the Plan acknowledge that there is a public walkway adjacent to their lands. There may be activities, including but not limited to, exposure to night lighting, traffic and noise which can cause disturbances to the occupants of these Lots during the day and evening.
Walkway. Roof Peripheral Walkway 1 set (with handrail) Roof Radial Walkway 1 set (with handrail) Platform Top Platform 1 set Pipe Support Tower 1 set Instrument Platform 1 set VRV &PRV Platform 1 set Stairway 1 set Pipe Supports & Brackets 1 set Inst Cable Support & Tray 1 set Elect Cable Support & Tray 1 set Settlement Measuring Clips 1 set CHENIERE LNG PROJECT, SABINE PASS LNG STORAGE TANKS TECHNICAL DATA SHEET APPURTENANCES PRV Design Code API RP520 & API 620 Type Pilot Operated (Alumna) Numbers 3+1(Spare) Size (Inlet/Outlet) 12” Set Pressure 17.237 Kpa 2.5 psig VRV Design Code API RP520 & API 620 Type Weight loaded Numbers 3+1(Spare) Size (Inlet/Outlet) 8” Set Pressure -206.8 Pa -0.03 psig
Walkway. Landlord, at Landlord's expense, agrees to construct a concrete walkway from the 5 reserved spaces in the parking lot in front of the Premises to the entrance to the Premises as shown on Exhibit H attached hereto and made a part hereof. Landlord agrees to complete the construction of the walkway no later than thirty (30) days after the execution of the Lease unless prior to commencement of the construction of the walkway, Tenant requests a delay in Landlord's performance.
Walkway. Purchasers of the following Lots and Blocks acknowledge that there is a public walkway adjacent to their lands, where there may be activities that cause disturbances to the occupants of these Lots during the day and evening; • Xxxx 00, 00, 00, 00, 00, 00, Xxxxxx 155, 158 & 197
Walkway. The parties hereto acknowledge and agree that there is a walkway (“Walkway”) connecting the Premises A building to the Premises C building. The easement for the Walkway is created by Grant from Illinois Central Gulf Railroad Company and the Chicago & Illinois Western Railroad dated December 11, 1979 and recorded with the Recorder’s Office as Document 25465574 (“Walkway Easement”). With respect to the Walkway, Lessee acknowledges and agrees as follows: (i) the Walkway shall be deemed part of the Premises, for all purposes, including, but not limited to, Lessee’s maintenance obligations under Paragraph 7 herein and Lessee’s indemnification of Lessor and any Indemnified Party under Paragraph 4 herein and Lessee shall be fully responsible, at its sole cost and expense, for any repair, maintenance or replacement of the Walkway; (ii) notwithstanding anything in Paragraph 18 and Paragraph 19 to the contrary, Lessor shall have no obligation to restore the Walkway in the event of a casualty or condemnation; (iii) in the event that the Walkway is no longer operational or Lessee is not provided access to the Walkway due to any reason, including without limitation, the City of Chicago denying the right to use the Walkway, such event shall have no effect on Lessee’s obligations under this Lease including, but not limited to, its obligation to pay Rent hereunder; (iv) upon Lessee’s abandonment of the Walkway or in the event that Lessee, for any reason whatsoever, does not occupy or is not the Lessee of both Premises A building and Premises C building, Lessee shall, at Lessor’s option, remove the Walkway, and restore the Premises as reasonably required by Landlord; (v) Lessee shall be bound by all of the terms and conditions of the Walkway Easement, and shall perform .all of the obligations ofGranteeimposed thereunder and (vi) in the event the Walkway needs to be removed for any reason prior to the end of the term of this Lease, the Lessee shall, at its sole cost and expense, remove the Walkway and restore the Premises as reasonably required by Landlord. Lessor shall in no way be liable or responsible for any loss, damage or expense that Lessee may sustain or incur by reason of Lessee’s inability to utilize the Walkway, and Lessee’s inability to utilize the Walkway shall not relieve Lessee from any of its obligations under this Lease.
Walkway. Enclosed or covered walkway between Commerce Way and Xxxxxx Drive buildings.
Walkway. The Owner shall install a walkway in Block 141 and Block 147 as indicated on Drawing #####