Insertion Clause Samples
POPULAR SAMPLE Copied 1 times
Insertion. Deletion
Insertion. IT IS RESOLVED to keep a copy of the above-mentioned resolutions in the corporate book of the corporation in accordance with section 117(2) of the Canada Business Corporations Act.
Insertion. Deletion Moved from Moved to Format change Moved deletion Inserted cell Deleted cell Moved cell Split/Merged cell Padding cell Count
Insertion. 1. Install CIPP in accordance with ASTM F1216 (direct inversion) or ASTM F1743 (pull installations) or F2019 (reinforced liners) as appropriate for the liner product used.
2. ▇▇▇▇▇▇▇ existing host pipe prior to installation 3. Insert wet-out tube through an existing manhole or approved access point by means of an inversion method and application of sufficient hydrostatic head to extend tube to next designated termination point.
Insertion. 12.1. These appliances will be inserted in the patient’s mouth AFTER the straps are installed. They are inserted together with the upper being placed first and then the patient slides into the lower tray. The product is solely for use by or on the order of a dental professional. They are not for over-the-counter use. Once the buttons, bite pads and discs are assembled to make an appliance, they should not be re-used to make another appliance. Bonding of the components will be affected and can lead to safety or efficiency limitations.
Insertion. The requirements of these Specifications shall be fully incorporated by the purchaser in the deed of sale and during the successive assignments by reproducing the full text. Seen and accepted by The City of SAINT DENIS The Mixed Economy Corporation for the Development of the Territory of Seine Saint Denis (SODEDAT 93) The Deputy Mayor The Chairman, Round Stamp – French Republic Saint-Denis Town Hall Liberty – Equality – Fraternity
1 – Minimum number of jobs assigned to surface areas for business and offices: 2 – Prohibited business activities CODE Definition STATEMENT OF NATURAL AND TECHNOLOGICAL HAZARDS INFORMATION RELATIVE TO COMPENSATION RELATED TO NATURAL DISASTERS
1. This statement of hazards is prepared on the basis of information made available by prefectural order
2. Address Municipality ZIP code ▇▇ ▇▇▇ ▇▇ ▇▇▇▇▇ - 93200 SAINT-DENIS
3. Location of the building with regard to one or several plans for the prevention of foreseeable natural hazards (PPRn)
4. Location of the building with regard to a technological hazards prevention plan (PPPt)
5. Location of the building with regard to regulatory zoning for the consideration of seismicity. Documents attached
Insertion. This attack involves an unauthorized party, who inserts new data claiming that it originates from a legitimate party. This attack is related to that of impersonation.
Insertion. 1. Install CIPP in accordance with practices outlined in ASTM F1216 for direct inversion installations and ASTM F1743 for pull in installations.
2. ▇▇▇▇▇▇▇ existing host pipe for CIPP installation that does not use inversion method to expand tube against pipe wall.
3. Use lubricant as recommended by manufacturer; no resin shall be lost by contact with pipe during pull-in process.
4. Insert wet-out lining system remotely from main by means of inversion process or pulled-in method, and application of hydrostatic head sufficient to extend tube fully to lateral termination point.
5. Utilize a hydrophilic sealant (or equivalent) to enhance a watertight seal.
6. Once installation has begun, maintain pressure sufficient to hold tube tight against host lateral pipe.
7. Complete installation process control sheet for every lateral lining completed. Control sheet shall provide the following information:
a. Type of connection seal
b. Lateral liner length
c. Hydrostatic head at point of inversion
d. Hydrostatic head at termination point
e. Time inversion process started
8. Trim back cured liner/resin composite pipe left protruding from main line or service connection using hydraulic-powered robotic cutting device specifically designed for cutting cured-in-place pipe.
9. Remove materials from sewer system and prevent from floating downstream. CONTRACTOR will be held responsible for cost of repairs or maintenance resulting from materials accumulating in downstream pump stations.
Insertion. (herein referred to as Short-Term Market Participant = „STM Participant“) Názov a sídlo organizačnej zložky: EIC organizačnej zložky: Name and a seat of the Slovak branch: EIC of the Slovak branch: a and Obchodné meno: Slovenská elektrizačná prenosová sústava, a. s. Sídlo: Mlynské nivy 59/A, 824 84 Bratislava, SR IČO: 35 829 141 DIČ: 2020261342 IČ pre DPH: SK2020261342 RČ SDE: SK52000800009 Zastúpená: ▇▇▇. ▇▇▇▇▇ ▇▇▇▇▇▇, PhD., predseda Predstavenstva ▇▇▇. ▇▇▇▇▇▇ ▇▇▇▇▇, PhD., podpredseda Predstavenstva Bankové spojenie: TATRA BANKA Bratislava Business name: Slovenská elektrizačná prenosová sústava, a. s. Registered seat: Mlynské nivy ▇▇/▇, ▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇▇▇, SR Registration Number: 35 829 141 Tax Registration No.: 2020261342 VAT Registration No.: SK2020261342 Electricity consumption tax registration No.: SK52000800009 Represented by: ▇▇▇▇▇ ▇▇▇▇▇▇, Chairman of the Board of Directors ▇▇▇▇▇▇ ▇▇▇▇▇, Vice-chairman of the Board of Directors Bank: TATRA BANKA Bratislava
Insertion. The SmartBall tool is typically inserted through a 4-inch or 6-inch gate valve into an active pipeline, as illustrated in Figure 4. In instances where a hot tap is required to provide access, Pure Technologies requires a six (6) inch tap. The gate valve for insertion is mounted on the top of the pipe, without any bends in the riser connecting the valve to the pipeline. The minimum internal diameter of the opening from the gate valve to the pipe must not be less than 4-inches or the insertion equipment will not pass through. A minimum of 4 feet overhead clearance is required above the top of the insertion valve flange.
