FULL BENCH CONSTRUCTION Sample Clauses

FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width except as construction staked or designed.
FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width. Purchaser shall end haul waste material to the location specified in Clause 4-37 WASTE AREA LOCATION. On the following road(s), the Purchaser shall construct the subgrade to the dimensions shown on the Intersection Detail.
FULL BENCH CONSTRUCTION. On any roads, where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width, except as construction staked or designed. If designated, Purchaser shall end haul waste material to the location specified in Clause 4-37 WASTE AREA LOCATION. Turnouts shall be intervisible with maximum of 1,000 feet between turnouts unless shown otherwise on drawings. Locations shall be adjusted to fit the final subgrade alignment and sight distances. Turnout locations shall be subject to written approval by the Contract Administrator.
FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width except as construction staked or designed. Purchaser shall construct turnouts as designated on the TURN OUT AND TURNAROUND LIST. Locations may be adjusted to fit the final subgrade alignment and sight distances. Locations changes are subject to written approval by the Contract Administrator. Minimum dimensions are shown on the TYPICAL SECTION SHEET.
FULL BENCH CONSTRUCTION. On the following road(s), and where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width. Purchaser shall end haul waste material to the location specified in Clause ▇-▇▇ ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇. ▇▇-▇-▇▇▇▇ where side slopes exceed 45%
FULL BENCH CONSTRUCTION. On the following road(s), and where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width. Purchaser shall end haul waste material to the location specified in Clause ▇-▇▇ ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇. PA-S-3140 10+00 —10+50, 11+80 – 12+65, 17+65 – 18+10 Purchaser shall construct turnouts intervisible with a maximum distance of 1,000 feet between turnouts unless otherwise shown on drawings. Locations may be adjusted to fit the final subgrade alignment and sight distances. Locations changes are subject to written approval by the Contract Administrator. Minimum dimensions are shown on the TYPICAL SECTION SHEET.
FULL BENCH CONSTRUCTION. On the following road(s), and where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width except as construction staked or designed. Purchaser shall construct turnarounds as designated on the ROCK LIST. Turnarounds must be no larger than 30 feet long and 30 feet wide.
FULL BENCH CONSTRUCTION. Where side slopes on the embankment side of the road exceed 45% and as listed below, Purchaser shall use full bench construction for the entire subgrade width. Purchaser shall end haul waste material to a location specified in Clause ▇-▇▇ ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇. C-9600 5+73 7+06 400 cy Purchaser shall construct turnouts as designated on the TURNOUT AND TURNAROUND LIST. Locations may be adjusted to fit the final subgrade alignment and sight distances. Locations are subject to written approval by the Contract Administrator. Minimum dimensions are shown on the TURNOUT LIST. Purchaser shall construct turnarounds as designated on the TURNOUT AND TURNAROUND LIST. Turnarounds must be no larger than 30 feet long and 30 feet wide. Locations are subject to written approval by the Contract Administrator.
FULL BENCH CONSTRUCTION. On the following road, Purchaser shall use full bench construction for the entire subgrade width. Purchaser shall end haul waste material to the location specified in Clause ▇-▇▇ ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇. DE-44 27+90 to 28+80 DRAFT
FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, full bench construction shall be utilized for the entire subgrade width except as construction staked or designed. Waste material shall be end hauled to the location specified by the Contract Administrator.