Facilities Description Sample Clauses

Facilities Description. “Facilities” means all facilities, pipelines (including natural gas, natural gas liquid and water pipelines), machinery, measurement equipment (including vehicles) and other equipment, accessions and improvements in respect of the foregoing, now or hereafter owned or leased by a member of the Partnership Group, unless ETRN and the Partnership determine to exclude any such assets from being subject to this Agreement (such excluded assets, “Excluded Facilities”).
AutoNDA by SimpleDocs
Facilities Description. The Fertilizer Plant is shown on Plot Plan A attached hereto. The Gasification Unit is shown on Plot Plan A attached hereto. The Ammonia Synthesis Loop is shown on Plot Plan A attached hereto. The UAN Plant is shown on Plot Plan A attached hereto. The Xxxxxx Facility is shown on Plot Plan A attached hereto. The Administrative and Warehouse Building is shown on Plot Plan A attached hereto. The Feedstock Delivery Points are shown on Plot Plan A and Drawing D11-0913B attached hereto. The coke Feedstock Delivery Point is the south side of the Refinery’s coke pit. The Utility Facilities are shown on Plot Plan A attached hereto. The Grounds are shown on Plot Plan A attached hereto. The Offsite Sulfur Recovery Unit is shown on Plot Plan A attached hereto. The Refinery is shown on Plot Plan A attached hereto. Plot Plan A Drawing D11-0913B ANNEX B ANALYSIS, SPECIFICATIONS AND PRICING FOR FEEDSTOCK AND SERVICES FEEDSTOCKS: Hydrogen -Gaseous -Purity not less than 99.9 mol. % -Flow 21 mmscf/day maximum -Pressure 450 psig ± 30 psi -Carbon Monoxide less than 10 ppm -Carbon Dioxide less than 10 ppm -Price for sales from Fertilizer Company to Refinery Company For the first 1.675 mmscfd (aggregated monthly) of Hydrogen, the Hydrogen price shall be $0.46 per 100scf based on an Ammonia Price of $300.00 per short ton. For any Hydrogen in excess of 1.675 mmscfd (aggregated monthly), the Hydrogen price for such excess Hydrogen shall be $0.55 per 100scf based on a UAN Price of $150.00 per short ton. The Hydrogen price per 100scf shall adjust as of the first day of each calendar month up or down in the same percentage as the Ammonia Price or UAN Price for the immediately preceding calendar month adjusts up or down from $300.00 per short ton or $150.00 per short ton, respectively. -Flow measurement All Hydrogen flows shall be measured by a standard sharp edge orifice plate and differential pressure transmitter located at the Fertilizer Plant. The measured flow shall be pressure and temperature compensated and totalized by the Fertilizer Plant's Honeywell process control computer (TDC 3000) or any replacement computer. All transmitter signals and computer calculations are available to the Refinery through the existing communications bus for verification. Calibration of the transmitter shall be done at least annually and may be done more frequently at Refinery Company's request. Nitrogen -Gaseous -Purity 99.99 mol. % (minimum) (5 ppm oxygen maximum) -Pressure 180 psig (+ 10 psig) -F...
Facilities Description. “Facilities” means all gathering pipelines, transportation pipelines, storage tanks, truck racks, terminal facilities, offices and related equipment, real estate and other assets, or portions thereof, conveyed, contributed or otherwise transferred or intended to be conveyed, contributed or otherwise transferred as of the Effective Date to the Partnership or any of its subsidiaries, or owned by, leased by or necessary for the operation of the business, properties or assets of the Partnership or any of its subsidiaries as of the Effective Date. In addition, if the Partnership acquires or constructs assets after the Effective Date, the assets directly connected to and constructed to support the operation of, or to replace any portion of, the Facilities shall automatically become a part of the Facilities.
Facilities Description. The Fertilizer Plant is shown on Plot Plan A attached hereto. The Gasification Unit is shown on Plot Plan A attached hereto. The Ammonia Synthesis Loop is shown on Plot Plan A attached hereto. The UAN Plant is shown on Plot Plan A attached hereto. The Linde Facility is shown on Plot Plan A attached hereto. The Administrative and Warehouse Building is shown on Plot Plan A attached hereto. The Feedstock Delivery Points are shown on Plot Plan A and Drawing D11-0913B attached hereto. The coke Feedstock Delivery Point is the south side of the Refinery’s coke pit. The Utility Facilities are shown on Plot Plan A attached hereto. The Grounds are shown on Plot Plan A attached hereto. The Offsite Sulfur Recovery Unit is shown on Plot Plan A attached hereto. The Refinery is shown on Plot Plan A attached hereto. EXHIBIT B
Facilities Description. “Facilities” means all facilities, pipelines, machinery, measurement equipment and other equipment, accessions and improvements in respect of the foregoing, owned or leased by the Company. In addition, if the Company acquires or constructs assets after the Effective Date, the assets directly connected to and constructed to support the operation of the Facilities shall automatically become a part of the Facilities and shall be managed and operated by the Operator under this Agreement. With respect to all other assets acquired or constructed by the Company after the Effective Date, the Parties shall enter into good faith negotiations to determine whether the assets shall be managed and operated by the Operator under this Agreement.
Facilities Description. The Client is provided with a telephone number that is known as the support line, which will be operational between the hours of 09:00 to 17:00 Monday to Friday except for Bank Holidays. Only calls made to this number or emailed will be processed as a helpdesk call. At the point a helpdesk call is made either an immediate response will be given or else an expert in the particular field will respond within the agreed time according to the service Level purchased. The Support Line number is 0203 758 9010. It is also possible to email support questions to Xxxxxxx@XXX-XX.xxx.
Facilities Description. The specifications are for service to the following facilities as follows: Building Name Address Estimated Cleaning Square Footage 1. Banning City Hall (Civic Center) 00 X. Xxxxxx Street 20,600 2. Banning Police Department 000 X. Xxxxxx Street 28,000 3. City Yard 000 X. Xxxxxxx Street 5,400
AutoNDA by SimpleDocs
Facilities Description. 2.1. List and provide a brief description of buildings
Facilities Description. “Facilities” means all facilities, pipelines, compression, dehydration, processing plants, pumps, machinery, measurement equipment and all other appurtenances and equipment, accessions and improvements in respect of the foregoing, owned, leased or operated by Summit Holdings and its subsidiaries. In addition, if Summit Holdings or any of its subsidiaries acquire or construct assets after the date of this Agreement, the assets directly connected to and constructed to support the operation of the Facilities shall automatically become a part of the Facilities and shall be managed and operated by the Operator under this Agreement.
Facilities Description. (a) The System Reinforcement, the Basic Transmission Extension and Customer Facilities required to be installed by each party to facilitate the supply of Electricity to the Customer at the Point of Delivery to supply the Customer’s Plant are generally described in Appendix 2 to this Agreement. The Shared Facilities are also as generally described in Appendix 2.
Time is Money Join Law Insider Premium to draft better contracts faster.