Deliverable description Sample Clauses

Deliverable description. 2.2.1 Startup Pack Workbook used to document Collin County specific configuration and usernames necessary in the application. Pack be provided to the client in a template/blank format to be filled out by client.
AutoNDA by SimpleDocs
Deliverable description. The deliverable D4.2 is structured in several chapters explaining the following key aspects related to the main characteristics of the actual status of the Demo Case building in Verzuolo: • General Introduction of the Deliverable, contributions and connections with partners and Tasks of HAPPENING Project • Description of the building, the place, the current systems installed and the present equipment • Energy Demand of the building for electricity, heating and cooling in the present situation • User requirement and desire on the building systems and equipment • Conclusions • Annexes Descriptions contained in these chapters will lead to a detailed knowledge of the characteristics of the building and a basis on which to make considerations and develop the best solutions for the renovation according to what has been studied and implemented within HAPPENING, which must combine the achievement of the project targets, the characteristics of the building and the requests of the end users.
Deliverable description. This deliverable calls for the development of new lead-free light absorbers for their application in perovskite solar cells. The power conversion efficiency of the different prepared light absorbers will be evaluated. Optical measurements will be performed in order to study the relaxation mechanisms which could limit this power conversion efficiency.
Deliverable description. Technical Assessment Provide Technical Assessment. Contractor will review those areas of the State's data processing environment; such as: standards and guidelines, development tools, technical resources, hardware capacities, software supported, networks, facilities, specified arrangements, etc related to the Statement of Work to be provided; and, if warranted, prepare a memorandum identifying areas where, in Contractor's opinion, the State's technical environment may materially impair Contractor from successfully completing the Contract. The Project Environment memorandum, if prepared, shall be submitted prior to delivery of the Project Work Plan.
Deliverable description. In this deliverable D6.2, a method is proposed for the environmental assessment of the HAPPENING system. The deliverable D6.2 is structured in several chapters: • Description of the HAPPENING concept and its environmental implications; • Methodology for environmental performance assessment; • Life Cycle GHG emissions of the HAPPENING system; • Discussion and conclusions; • Annexes, including extra information of the content developed in this deliverable.
Deliverable description swf files One file for the 30-second splash presentation
Deliverable description. Power Oxidizer dump valve leakage · Perform and report on natural gas sniffer test at dump valve stacks at Initial System Site to verify absence of leakage · Include regular identical test in the inspection / maintenance manual for the Power Oxidizer Power Oxidizer filter Perform and report on hot soak calculation to provide an estimate how long the components above the turbine inlet pipe remain above [***] after a hot shut down Integrated controls Demonstrate start-up and steady-state sequencings at Initial System Site Test Reviews. D-R will have 5 days following delivery of the Initial System Deliverables (such 5-day period a “Deliverables Review Period”) to determine whether the applicable requirements in this Annex A have been met. If D-R does not provide written notice to E-C of its determination that such requirements have not been fully met, specifying the reason for rejection, within 5 business days following the termination of the Deliverables Review Period, the requirements of this Annex A will be deemed to have been met at the end of such 5 business days.
AutoNDA by SimpleDocs
Deliverable description. The deliverable D7.5. is structured into 3 main chapters:
Deliverable description. The delivered FOD System meets the business requirements of the County as detailed in the Final System Acceptance Report. The Contractor has successfully completed the required System setup and integration for the Solution satisfies the criteria as specified in the scope of services for RFP872. Deliverable Date: Accepted Unconditionally: Yes / No Accepted Conditionally: Yes / No Passed 30 Day Reliability Period: Yes / No Acceptance Conditions: Not Accepted: Reason: General Comments: Delivered By: Signature Name Date Accepted By: Signature Name Date APPENDEX E – ESCROW AGREEMENT INSTRUCTIONS: BEST AND FINAL OFFER FORM B-1 - PRICE PROPOSAL SCHEDULE FOREIGN OBJECT DEBRIS DETECTION SYSTEM The Proposer’s price shall be submitted on this Form B-1 “Price Proposal Schedule”. Proposer is requested to fill in the applicable blanks on this form. Pricing must include all cost elements including, but not limited to, software licenses, equipment/devices, implementation, bonding, configuration, integration, testing, training, maintenance, support, and professional support services required to meet the specifications outlined in Section 2.0 of this solicitation document.
Deliverable description. [Describe the deliverable’s objectives and scope. Discuss the level of detail to be provided such as “will describe the rationale for design decisions, will provide a textual summary of the design with detailed design pseudocode in the appendices, will include database schema diagrams and database table relationships, field sizes and descriptions, and indices and keys”. Discuss the intended audience. If the document assumes a specific knowledge level, list the key concepts that must be understood (e.g., understanding of backup rotation schedules, understanding of registry editing, etc.). Do not use vague terms such as “basic knowledge of system administration”.]
Time is Money Join Law Insider Premium to draft better contracts faster.