Construction Estimate Sample Clauses

Construction Estimate. The Engineer shall prepare the Preliminary Estimated Construct Costs for the Project as required in the Agreement. The Preliminary Estimated Construct Costs shall be monitored, verified and updated throughout the course of the development of the Project as provided in the Agreement.
AutoNDA by SimpleDocs
Construction Estimate. The Design Builder will provide estimating services including 60% document budget and estimating case studies and evaluations as needed to facilitate advancement and on budget delivery of the project.
Construction Estimate. The ENGINEER shall prepare a project estimate of the probable cost. The estimate shall be prepared for the project at 60%, 90% and 100% submittals using MS Excel program. The MS Excel spreadsheet shall include columns with recent average low bid unit prices as well as the ENGINEER’s unit price for each item.
Construction Estimate. The Engineer shall prepare a preliminary estimate for the construction of the Project. The preliminary construction estimate shall be monitored, verified and updated throughout the course of Project development.
Construction Estimate. The term "Construction Estimate" shall mean a cost estimate for the completion of the entire Scope of Work for the Project, which estimate shall include all components of the Cost of the Work, as well as the Construction Manager’s Fee for the Project.
Construction Estimate. Prepare a construction estimate for the needed improvements. This would establish the level of participation for the TOWN as it exists today.
Construction Estimate. Prepare a construction estimate for the needed improvements. This would establish the level of participation for all new development in the form of impact fees.
AutoNDA by SimpleDocs
Construction Estimate. Consultant will provide quantities and 30% design construction cost estimates with each alternative. Assumptions:  This scope and budget assume that no changes to the stormwater system are required as a result of this project. Task 7 Deliverables:  Design Charrette meeting minutes including decision pointsAlternatives Analysis Documentation  30% Strip Map of Preferred Alternative (one electronic copy in PDF form and one paper copies)  Photometric Analysis and 30% pole locations  Landscape Design concept memo  Memorandum summarizing changes in impervious surface areas and resultant stormwater system needs.  30% Cost Estimate Task 8 Final Design (60%, 90% and 100% Bid Ready) The outcome of Task 8 (i.e., preferred alternative) will be the foundation for proceeding with the plan production of the preferred design. This task includes the final construction documents necessary to solicit permits and advertise for construction bids. We anticipate the following construction sheets being required: Sheet Series Title Number of Sheets Cover, Legend, Index 3 Typical Sections 2 Details 6 Grading & Erosion Control 4 Detailed Grading (Curb Return) 8 Detailed Grading (Driveway) 7 Landscape 5 Plan & Profile 8 Illumination 4 Signing & Striping 8 Traffic Signal 6 Waterline 8 Utility Undergrounding 7 Earthwork Cross Sections 12 Total 88
Construction Estimate. At the time of submittal of Final Design Plans, the Engineer shall prepare an estimate of construction quantities and develop a final statement of probable construction cost.
Construction Estimate. The sum of (a) a Construction Bid, (b) $1.50 times the Building Area (which amount is the estimated cost of Change Orders), and (iii) $2.50 times the Building Area (which amount is the estimated cost of Tenant's Architect's services and expenses).
Time is Money Join Law Insider Premium to draft better contracts faster.