Conceptual Design Phase Sample Clauses

Conceptual Design Phase. The Design Consultant shall work with the Project Team to create a conceptual design by: June 19,
AutoNDA by SimpleDocs
Conceptual Design Phase. The consultant shall prepare concept plans for selection of one plan for further development. The Consultant shall prepare as many conceptual plans and studies as may reasonably be required until the Agency shall accept one such conceptual design accomplishing project goals given site conditions. A completed Conceptual Design package may include, but not be limited to, the following:
Conceptual Design Phase. The CONSULTANT will complete a conceptual streetscape design along the Manchester Road (Route 100) corridor as described in the above General Project Scope section. The following tasks will be performed to achieve these goals:
Conceptual Design Phase. A. Verify Owner’s program so that Architect and Owner have a mutual understanding of the Project requirements.
Conceptual Design Phase. The Architect will participate with and assist the Owner and Construction Manager, as required, in developing and refining the general concept for the Project described in Article I in accordance with the Design Schedule from time to time in effect.
Conceptual Design Phase. N/A for Supplemental Agreement No. 1 Cost $106.00 $492.00 $204.00 3. RECONNAISSANCE PHASE Project Manager $41.00 4 $164.00 Lead Project Engineer II $34.00 8 $272.00 Survey Project Manager $34.00 2 $68.00 Registered Land Surveyor $39.00 2 $78.00 Technician II $20.00 3 $60.00 Survey Chief $32.00 16 $512.00 Surveyor I $23.00 2 $46.00 Surveyor II $28.00 2 $56.00 4. RIGHT OF WAY DESIGN PHASE Project Manager $41.00 28 $1,148.00 Lead Project Engineer II $34.00 40 $1,360.00 Staff Engineer $26.50 44 $1,166.00 Registered Land Surveyor $39.00 18 $702.00 Technician II $20.00 24 $480.00 5. FINAL DESIGN PHASE Project Manager $41.00 27 $1,107.00 Lead Project Engineer II $34.00 56 $1,904.00 Staff Engineer $26.50 59 $1,563.50 6. BIDDING AND CONSTRUCTION PHASE N/A for Supplemental Agreement No. 1 TWM Labor Sub‐Total 355 hrs $11,488.50 TWM Payroll Overhead, Gen. & Admin Overhead (Est. at 167.49% X Subtotal) $19,242.09 Total Labor and Overhead $30,730.59 TWM Fixed Fee (14% X Total Labor and Overhead) $4,302.28 TWM Facilities Capital Cost of Money (FCCM) Rate (0.27% X TWM Labor Subtotal) $31.02 TWM Total Labor, Overhead & Fixed Fee $35,063.89 Other Direct Costs Mileage: 236 miles Rate = $ 0.575 Subconsultant: TSi Geotechnical, Inc. Subconsultant: Civil Design, Inc. DBE % = 14.5% Title Commitments: Completed by City of Wildwood Printing, Postage, and Copies $135.70 $0.00 $6,002.76 $300.00 Direct Cost and Subconsultant Subtotal $6,438.46 Total Supplemental Agreement No. 1 $41,502.35 Summary (Design Phase) Original Agreement $187,957.93 Supplemental Agreement $41,502.35 TOTAL $229,460.28 12/23/2020 ATTACHMENT B: ESTIMATE OF COST Supplemental Agreement No. 1 Local Agency: City of Wildwood, Missouri Section: N/A Project: TWM Project No. : TAP-5536(611) - Manchester Road Shared Use Path 180024 Project Length: 0.69 miles = 3640 linear feet Anticipated Construction Cost of Project: $1,020,000 TWM Staff Time Estimate Hours by Classification Total Cost Per Task Total Hours Basic Scope of Engineering Services Estimated Sheet Count QA/QC Project Manager Lead Project Engineer II Staff Engineer Senior Structural Engineer Structural Engineer III Survey Personnel Survey Project Manager Registered Land Surveyor Technician II Survey Chief Surveyor I Surveyor II A. Additional Project Management and QA/QC 2 12 6 $802.00 Phase Sub-Total = $106.00 $492.00 $204.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $802.00 $802.00 A. N/A $0.00 Phase Sub-Total = $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ...
Conceptual Design Phase. § 2.0.1 The Construction Manager will join the ongoing conceptual design effort and shall participate as a part of the Project Team to develop a final program, determine site usage, develop a cost model, outline an overall schedule and develop one or more concept designs to prepare for the Architect’s Schematic Design Phase.
AutoNDA by SimpleDocs
Conceptual Design Phase. Compensation for the Conceptual Design Phase Services (the “Conceptual Design Phase Services Cost”) shall not exceed dollars ($ ), plus Washington State sales due on this amount, and shall be paid on an hourly basis at the rates and for the individuals specified in Exhibit to this Agreement. In addition, the Construction Manager shall receive compensation for any pre- approved non-labor costs incurred to perform the Conceptual Design Phase Services, including equipment at the
Conceptual Design Phase. 1. Prepare three (3) conceptual plan sketches to illustrate the proposed design. Plans will include existing and proposed site plan, floor plans, floor areas, furniture and equipment.
Conceptual Design Phase. If specified in an Architect Release, Architect shall provide the following Services during the Conceptual Design Phase, based on the information provided in Architect Release:
Time is Money Join Law Insider Premium to draft better contracts faster.