Project Highway definition

Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;
Project Highway or “highway” shall mean any road or bypass that is constructed, operated or maintained under a concession agreement;
Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of “Special Repair of NH-202, Mokokchung – Tuensang (from Km 00.00 to Km 95.00) [Total Length = 95.00 Km] in the state of Nagaland for the FY 2020-21” and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

Examples of Project Highway in a sentence

  • The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

  • The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services.

  • The Authority shall assist the Contractor in obtaining the Applicable Permits for felling of trees in non-forest area to be identified by the Authority for this purpose if, and only if, such trees cause a Material Adverse Effect on the construction or maintenance of the Project Highway.

  • No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer.

  • Save and except as otherwise expressly provided in this Agreement, in the event that the Project Highway or any part thereof suffers any loss or damage during the Maintenance from any cause attributable to the Contractor, the Contractor shall, at its cost and expense, rectify and remedy such loss or damage forthwith so that the Project Highway conforms to the provisions of this Agreement.


More Definitions of Project Highway

Project Highway or “Highway” means any road or bypass that is constructed, operated maintained under a Concession Agreement;
Project Highway means the Site comprising Construction of Balance work of Two-lane with paved shoulder of Joram-Koloriang Road (NH-713) on EPC Basis from existing Km 50.050 to km 70.000 [Design Km44+000 to Km 59.363]( Design length-15.363 Km) the State of Arunachal Pradesh under SARDP-NE. and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;
Project Highway means the Site comprising “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement; “Project Milestone” means the project milestone set forth in Schedule-J; “Proof Consultant” shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; Contract AgreementPage 23 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH- 37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” (2nd Call) Feb 2023 “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; “Scheduled Completion Date” shall be the date set forth in Clause 10.3; “Scheduled Construction Period” means the period commencing from the Appointed Date and ending on Scheduled Completion Date; “Scope of the Project” shall have the meaning set forth in Clause 2.1; “Section” means a part of the Project Highway; “Site” shall have the meaning set forth in Clause 8.1; “Specifications and Standards” means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; "Stage Payment Statement" shall ...
Project Highway means the Site comprising “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;
Project Highway means the Site comprising the construction of the elevated corridors within the Bengaluru Metropolitan region and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;
Project Highway means the Site comprising Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis. and all Project Assets,and its subsequent development and augmentation in accordance with this Agreement;
Project Highway means the Site comprising Improvement and widening to two lane with paved shoulder of road from km 21.100 to km 29.200(Total length:8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis. and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;